• 中国科学引文数据库(CSCD)来源期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国核心学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2014, Vol. 34 ›› Issue (9): 844-848.DOI: 10.3973/j.issn.1672-741X.2014.09.005

• 研究与探索 • 上一篇    下一篇

GPST工法管片接缝防水技术研究

宁佐利   

  1. (上海市城市建设设计研究总院, 上海 200125)
  • 收稿日期:2013-11-01 修回日期:2014-07-07 出版日期:2014-09-20 发布日期:2014-09-22
  • 作者简介:宁佐利(1975—),男,四川内江人,2002年毕业于西南交通大学,隧道工程专业,硕士,高级工程师,现从事地下工程设计及科研工作。
  • 基金资助:

    上海市科学技术委员会科研计划项目(11231202703)

Study on Waterproofing Joints of Segments in GPST Method

NING Zuoli   

  1. (Shanghai City Urban Construction Design and Research Institute, Shanghai 200125, China)
  • Received:2013-11-01 Revised:2014-07-07 Online:2014-09-20 Published:2014-09-22

摘要:

接缝是盾构隧道渗漏水发生的主要部位,而接缝面止水是盾构隧道防水的关键。盾构隧道接头防水是通过接缝面上的接触压力将密封材料压缩而产生堵水作用,但接触面压力又受接头错位和张开量的影响。为了解决南京地铁某GPST(地面出入式盾构)工法在超浅覆土及负覆土下掘进过程中,盾构千斤顶顶推力不足、接缝止水条难以达到预定的压缩量和挤密的问题,通过试验和仿真分析的方法,得出适用于浅覆土管片接缝的低硬度、高孔洞率止水条; 止水条耐水性能试验结果表明,止水条能够满足本工程管片接缝长期止水的要求。

关键词: 盾构隧道, GPST工法, 接缝防水, 止水条性能

Abstract:

Joint is the main part where leakage occurs in shield tunnels, and the waterproofing of the joint surface is the key of the waterproofing of shield tunnels. The waterproofing of the joints of shield tunnels depends on the compression of the water sealing materials on the contact surface of the joints under the action of the contact pressure. However, the contact pressure is influenced by the dislocation and opening of the joints. Regarding GPST ( Ground Penetrated Shield Technology) applied in the construction of Nanjing Metro, the shield is boring under supershallow soil cover or even without soil cover, the thrust force of the cylinders is inadequate, which results in insufficient compression and compactness of the water sealing strips. Tests and simulations are made in order to solve the abovementioned problems and water sealing strips with low hardness and high porosity suitable for segments under shallow soil covers are developed. The waterproofing tests on the water sealing strips developed demonstrate that the water sealing strips developed can meet the longterm waterproofing requirements of the segments of the mentioned project.

Key words: shield tunnel, GPST method, joint waterproofing, property of water sealing strip

中图分类号: