隧道建设(中英文) ›› 2021, Vol. 41 ›› Issue (10): 1794-1800.DOI: 10.3973/j.issn.2096-4498.2021.10.019

• 施工机械 • 上一篇    下一篇

全断面竖井掘进机研制及关键系统试验

郑康泰, 贾连辉, 牛梦杰*, 吕旦, 肖威, 王晓龙   

  1. (中铁工程装备集团有限公司, 河南 郑州 450016)
  • 出版日期:2021-10-20 发布日期:2021-11-04
  • 作者简介:郑康泰(1982—),男,黑龙江牡丹江人,2006年毕业于大连交通大学,材料成型与控制专业,本科,高级工程师,主要从事隧道掘进机的设计与相关技术管理工作。E-mail: zhengkangtai@crectbm.com。*通信作者: 牛梦杰, E-mail: 18810560716@163.com。
  • 基金资助:
    郑州市重大科技创新专项项目(2019CXZX0049); 中国中铁股份有限公司科技研究开发计划(2019-重大-12

Development and Key System Test of FullFace Shaft Tunneling Machine

ZHENG Kangtai, JIA Lianhui, NIU Mengjie*, LYU Dan, XIAO Wei, WANG Xiaolong   

  1. (China Railway Engineering Equipment Group Co., Ltd., Zhengzhou 450016, Henan, China)
  • Online:2021-10-20 Published:2021-11-04

摘要: 传统矿山法竖井施工面临着涌水、地热和地应力等危险性问题,钻井法对地层的适应性较差,沉井法受开挖深度的限制。为解决竖井施工效率低、环境恶劣、安全性低和机械化程度低等问题,结合隧道掘进机技术及矿山法竖井施工工艺,研发设计一种集开挖、出渣和支护平行作业的全断面竖井掘进机。根据目前竖井施工的支护方式,取消后配套改用吊盘结构,采用多地层同步清渣的破岩系统、多机构联合排渣技术、环形支撑推进系统、专用导向系统和设备远程控制系统等多项创新性设计。该研制成果已在厂区基坑内完成关键系统的功能试验,可实现掘进、出渣同步作业,试验成井井壁质量较好,为竖井全断面施工提供了一种可靠的工法,有助于竖井施工的机械化发展。

关键词: 全断面竖井掘进机, 同步清渣, 多机构联合排渣, 环形支撑推进系统, 竖井专用导向系统

Abstract: The shaft excavated using the traditional mining method faces dangerous water inrush, geothermal, and insitu stress problems. The drilling method has limited adaptability to formations, and the caisson method is restricted by the excavation depth. To improve the construction efficiency, environment, safety, and mechanized level of shaft construction, a fullface shaft tunneling machine integrating excavation, mucking, and supporting is designed based on the tunnel boring machine technology and the shaft mining method. A hanging plate replaces the backup system, and multiple innovative designs, including rock breaking system while muck removing, muck discharge by multiinstitution, annular support propulsion system, special guiding system, and remote control system, are adopted considering the current shaft supporting method. A functional test has been conducted on a developed machine in a foundation pit, synchronous tunneling and mucking have been realized, and the shaft wall is of good quality. The results show the feasibility of the method for fullface shaft construction and promote the mechanized development of shaft tunneling.

Key words: fullface shaft boring machine, synchronous muck removal, multi-institution muck discharge, annular support propulsion system, shaft special guiding system

中图分类号: