隧道建设(中英文) ›› 2021, Vol. 41 ›› Issue (12): 2157-2162.DOI: 10.3973/j.issn.2096-4498.2021.12.017
• 施工技术 • 上一篇 下一篇
刘映晶
出版日期:
发布日期:
作者简介:
LIU Yingjing
Online:
Published:
摘要: 针对盾构掘进过程中出现滚动角增大的问题,以杭州地铁7号线城站站—四季青站区间盾构掘进工程为依托,提出采用钢楔机构装置纠正盾构滚动角的新方法; 建立盾构掘进过程中的转矩计算公式,在此基础上,给出相应参数计算方法,并结合实际工程对纠偏方法进行验证; 最后研究隧道埋深、地层类型和盾构直径等参数对钢楔机构数量的影响。研究结果表明,钢楔机构纠偏装置可以快速有效地解决盾构滚动角过大的问题。
关键词: 土压平衡盾构, 滚动角, 钢楔机构, 纠正装置, 施工技术
Abstract: The rolling angle of a shield would increase during tunneling. Accordingly, a new correction method for the rolling angle of the shield using steel wedge structure is proposed based on the shield tunneling project between the Chengzhan station and the Sijiqing station of Hangzhou metro line 7. Furthermore, the torque calculation formula is developed, the calculation methods for the associated parameters are provided, and the correction method is validated in a real-world project. Finally, the influence of tunnel depth, soil type, shield diameter, etc., on the number of steel wedge structures is analyzed. The results show that the steel wedge structure can quickly and effectively correct the rolling angle of the shield.
Key words: earth pressure balanced shield, rolling angle, steel wedge structure, correction device, construction technology
中图分类号:
U 455
刘映晶. 土压平衡盾构滚动角纠正方法研究[J]. 隧道建设, 2021, 41(12): 2157-2162.
LIU Yingjing. Rolling Angle Correction Method for Earth Pressure Balanced Shield[J]. Tunnel Construction, 2021, 41(12): 2157-2162.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.suidaojs.com/CN/10.3973/j.issn.2096-4498.2021.12.017
http://www.suidaojs.com/CN/Y2021/V41/I12/2157
复合地层土压平衡盾构斜穿地下连续墙推进力计算研究——以南宁市轨道交通5号线新广区间盾构隧道工程为例
复杂地层中盾构掘进速度的调控分析——以新建铁路横琴至珠海机场段HJZQ-2标隧道工程为例