• 中国科学引文数据库(CSCD)来源期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国核心学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2021, Vol. 41 ›› Issue (2): 274-282.DOI: 10.3973/j.issn.2096-4498.2021.02.014

• 施工技术 • 上一篇    下一篇

高原富水冰碛隧道洞内坍塌成因与处置技术研究——以拉林铁路米林隧道为例

陈天明   

  1. (中铁十九局集团有限公司, 北京 100176
  • 出版日期:2021-02-20 发布日期:2021-03-06
  • 作者简介:陈天明(1973—),男,湖南娄底人,2014年毕业于中南大学,建筑工程专业,本科,高级工程师,主要从事工程施工技术、企业经济与管理的研究工作。E-mail: 623668567@qq.com。

Causes and Countermeasures for Collapse in a WaterRich Moraine Tunnel in a Plateau Area: a Case Study on Milin Tunnel of LhasaNyingchi Railway

CHEN Tianming   

  1. (China Railway 19 Bureau Group Co., Ltd., Beijing 100176, China)
  • Online:2021-02-20 Published:2021-03-06

摘要: 为了解高原富水冰碛地层的工程地质特性,剖析其隧道洞内坍塌的成因,探索其工程处治措施,以拉林铁路米林隧道为例,对上述3个方面进行深入研究,并提出施工注意事项。研究结果表明: 1)高原富水冰碛地层透水性较好,低温易冻胀,抗剪强度随围岩含石量和密实度的增加而增大,随围岩细颗粒含量和含水率的增加而减小,地表水、地下水对冰碛地层围岩有较强的浸泡软化和迁移破坏作用; 2)冰碛地层中细颗粒含量较高和地下水较为发育等因素相互作用导致围岩失稳,通常是造成富水冰碛地层隧道坍塌的原因; 3)对于富水冰碛地层隧道坍塌处治,主要应做好回填碴体和围岩架空区注浆加固,设置安全护拱与塌腔排水系统,并采用合理的开挖和支护方式。

关键词: 富水冰碛隧道, 坍塌成因, 处置技术, 地质力学特征

Abstract: The engineering geological characteristics of the waterrich moraine Milin tunnel on LhasaNyingchi railway, causes of collapse, and corresponding countermeasures are studied in detail. The research results show the following. (1) The waterrich moraine stratum in the plateau is characterized by good water permeability and is prone to frost heaving at low temperatures. The shear strength increases with the increasing rock content and density of surrounding rocks, and decreases with the increasing fine particle content and water content of surrounding rocks. The surface water and groundwater have strong effects on the immersion, softening, migration, and destruction of surrounding rocks. (2) The interaction between the high content of fine particles in the moraine stratum and the development of groundwater would cause an instability in the surrounding rock, and further cause the tunnel to collapse. (3) Grouting reinforcement should be strengthened in the area of backfilling of the ballast body and surrounding rock overhead, a safety arch protection and cavein drainage system should be set up, and rational excavation and support methods should be adopted.

Key words: waterrich moraine tunnel, collapse cause, countermeasure, geological and mechanical model

中图分类号: