• 中国科学引文数据库(CSCD)来源期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国核心学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2023, Vol. 43 ›› Issue (S1): 373-381.DOI: 10.3973/j.issn.2096-4498.2023.S1.043

• 规划与设计 • 上一篇    下一篇

既有矿洞改扩建成地下实验室设计方案可行性研究

孙国文1, 宋超业1, 李国清1, 付功云1, 尹芳1, 武宇翔2   

  1. 1. 中铁第六勘察设计院集团有限公司, 天津 300131 2. 之江实验室, 浙江 杭州 311121
  • 出版日期:2023-07-31 发布日期:2023-08-28
  • 作者简介:孙国文(1991—),男,江西泰和人,2014年毕业于厦门大学嘉庚学院,土木工程专业,本科,工程师,现从事隧道与地下工程设计方面的工作。Email: 1079590542@qq.com。

Feasibility Study on Design Scheme of Underground Laboratory by Expanding Existing Mine Tunnel

SUN Guowen1, SONG Chaoye1, LI Guoqing1, FU Gongyun1, YIN Fang1, WU Yuxiang2   

  1. 1. China Railway Liuyuan Group Co., Ltd., Tianjin 300131, China; 2. Zhijiang Laboratory, Hangzhou 311121, Zhejiang, China
  • Online:2023-07-31 Published:2023-08-28

摘要: 为解决高精度、高灵敏前沿物理实验室运行环境高稳定需求,以莫干山矿洞改扩建工程为实例,基于既有矿洞造价低、建设周期短、稳定性强、功能基本齐备等优势,对既有矿洞改扩建成公里级地下实验室的设计方案可行性展开研究,提出“因地制宜、特色突出、有限改造、同步建设、空间预留”的设计理念,创新性地采用高密度电法、地质雷达法等综合推演采空区数据,建立可靠性高的既有矿洞改扩建成地下实验室设计体系。研究结果表明: 1)充分利用既有矿洞平纵横的空间条件,能够对南侧矿洞功能进行合理定位,并预留扩容条件; 2)采用原位单侧和双侧2种改扩建形式,能够解决设计中断面选型的设计难点; 3)采用上部注浆加固和下部综合治理方案,有利于解决采空区治理的难题; 4)采用火灾的早期预测和其他控制措施,能够有效降低火灾发生频率及损失。

关键词: 矿洞改扩建, 地下实验室, 断面选型, 采空区治理, 隧道消防设计

Abstract: In order to meet the high stability requirements of highprecision and highly sensitive cuttingedge physics laboratory operating environment, by taking the Moganshan mine tunnel renovation and expansion project as an example, the feasibility of the design scheme for the renovation and expansion of existing mines into kilometer level underground laboratories is studied based on the advantages of low cost, short construction period, strong stability, and basic completeness of functions of existing mines. The design concept of "adapting to local conditions, highlighting characteristics, limited renovation, synchronous construction, and space reservation" is proposed, highdensity electrical methods, geological radar methods, and other comprehensive methods are used to deduce goaf data, and a highly reliable design system for the renovation and expansion of existing mines into underground laboratories is established. The research results indicate that: (1) By fully utilizing the spatial conditions of the existing mine tunnels in both horizontal and vertical directions, the functions of the mine tunnels on south sides can be reasonably positioned, and expansion conditions can be reserved; (2) Adopting two forms of reconstruction and expansion, i.e., insitu single side and double side, the design difficulties of section selection can be solved; (3) Adopting the treatment plan of upper grouting reinforcement and lower comprehensive, the goaf treatment problem is easy to be solved; (4) The use of early fire prediction and other control measures can effectively reduce the frequency and losses of fires.

Key words: mine tunnel renovation and expansion, underground laboratory, section selection, goaf management, tunnel fire protection design