隧道建设(中英文) ›› 2013, Vol. 33 ›› Issue (11): 942-948.DOI: 10.3973/j.issn.1672-741X.2013.11.009

• 规划与设计 • 上一篇    下一篇

宝兰客专渭河隧道1号竖井设计

吉艳雷   

  1. (中铁第一勘察设计院集团有限公司桥隧处, 陕西西安 710043)
  • 收稿日期:2013-04-18 修回日期:2013-09-10 出版日期:2013-11-20 发布日期:2013-11-15
  • 作者简介:吉艳雷(1982—),男,山西运城人,2008年毕业于西南交通大学隧道及地下工程专业,硕士,工程师,从事隧道与地下工程设计研究工作。

Design of No. 1 Shaft of Weihe Tunnel on BaojiLanzhou Passengerdedicated Railway

JI Yanlei   

  1. (Bridge and Tunnel Design Department, China Railway 1st Survey and Design Institute Group Ltd., Xi’an 710043, Shaanxi, China)
  • Received:2013-04-18 Revised:2013-09-10 Online:2013-11-20 Published:2013-11-15

摘要:

宝兰客专渭河隧道全长10016 km,设置3竖井2斜井辅助施工,1号竖井深544 m,开挖断面230 m2,属于深大竖井,地层上软下硬,选择安全合理的结构型式及施工方法意义重大。结合实际地质情况及受力分析,采用钻孔咬合桩加喷锚支护的联合支护型式,逆作法施工,并设置内衬墙,保证了竖井施工安全;竖井回填加设钢筋混凝土隔板,确保正洞隧道结构受力安全。

关键词: 渭河隧道, 深大竖井, 围护结构, 咬合桩, 喷锚支护

Abstract:

Weihe tunnel on BaojiLanzhou passengerdedicated railway is 10.016 km long. Three vertical shafts and two inclined shafts are installed for the tunnel so as to speed up the tunnel construction. With 54.4 m depth and 230 m2 excavation crosssection area, No. 1 vertical shaft of Weihe tunnel is an extralarge and deep shaft. The vertical shaft is located in hardsoft heterogeneous ground. Therefore, it is of great significance to select a safe and rational structure type, as well as a proper construction method, for the vertical shaft. Support structure consisting of secant piles and shotcreting and rockbolting, topdown construction method, as well as inner lining, are selected for the vertical shaft on basis of the actual geological conditions and the stress analysis results. Bracing made of reinforced concrete is installed when the vertical shaft is backfilled, so as to ensure the structural safety of the tunnel. This paper can provide reference for the design of similar projects in the future.

Key words: Weihe tunnel, extralarge and deep vertical shaft, retaining structure, secant pile, shotcreting and rockbolting