隧道建设(中英文) ›› 2015, Vol. 35 ›› Issue (6): 571-578.DOI: 10.3973/j.issn.1672-741X.2015.06.013

• 施工技术 • 上一篇    下一篇

深圳地铁盾构穿越建筑群及切削桩基施工

孙波1, 肖龙鸽2, 孙正阳3, 殷明伦3, 罗泽华4   

  1. 1. 深圳市地铁集团有限公司, 广东深圳 518026; 2. 中建南方投资有限公司, 广东深圳 518026; 3. 中国矿业大学(北京)力学与建筑工程学院, 北京 100083; 4. 中建交通建设集团有限公司, 北京 100044)
  • 收稿日期:2015-03-08 修回日期:2015-04-10 出版日期:2015-06-20 发布日期:2015-06-25
  • 作者简介:孙波(1967—),男,安徽萧县人, 1988年毕业于西南交通大学,铁道工程地质专业,本科,高级工程师,从事地铁建设技术和管理工作。

Shield Boring Underneath Buildings by Cutting Existing Foundation Piles: Case Study on Running Tunnel from Grand Theatre Station toLudan Village Station on Line 9 of Shenzhen Metro

SUN Bo1, XIAO Longge2, SUN Zhengyang3, YIN Minglun3, LUO Zehua4   

  1. (1. Shenzhen Metro Group Co., Ltd., Shenzhen 518026, Guangdong, China; 2. China Construction South Investment Co., Ltd., Shenzhen 518026, Guangdong,China; 3. School of Mechanics and Construction Engineering, China University of Mining and Technology, Beijing 100083, China; 4. China Construction Communications Engineering Group Ltd., Beijing 100044, China)
  • Received:2015-03-08 Revised:2015-04-10 Online:2015-06-20 Published:2015-06-25

摘要:

为解决在不影响既有桩基建筑物安全的情况下保证盾构法隧道正常施工的问题,在消化吸收国内外盾构下穿建筑物和切削桩基技术的基础上,以深圳地铁9号线大剧院—鹿丹村区间工程为例,根据地层及既有建筑物情况,对现有盾构下穿方案进行改进。首先理论分析验证方案可行性,然后确定具体施工措施,并在实施中严格控制施工质量。总结了盾构法施工下穿桩基建筑群的施工技术: 1)提前加固下穿区土体; 2)设置盾构推进试验段; 3)盾构改造; 4)地面二次注浆。施工措施有效地保证了盾构的顺利下穿,确保了既有建筑物的安全。

关键词: 深圳地铁, 盾构, 切除桩基, 无托换, 下穿建筑群

Abstract:

In this paper, the technologies for shield boring underneath existing buildings from Grand Theater station to Ludan Village station of Shenzhen Metro is determined on basis of studying on relative technologies in China and abroad, so as to guarantee safe shield boring and avoid adverse impact on the existing pile foundations. The practicability of the construction technologies is theoretically analyzed, and the details of the construction technologies are determined. The construction technologies, including ground consolidation, trial boring, shield modification and ground surface secondary grouting, are summarized. In the end, the shield has crossed underneath the buildings successfully, and the safety of the buildings has been guaranteed.

Key words: Shenzhen Metro, shield, foundation pile cutting, nonunderpinning, boring crossing underneath buildings

中图分类号: