隧道建设(中英文) ›› 2015, Vol. 35 ›› Issue (11): 1182-1187.DOI: 10.3973/j.issn.1672-741X.2015.11.011

• 规划与设计 • 上一篇    下一篇

富春江通航隧道建筑限界及内轮廓设计研究

吴德兴1, 周红升1, 郭洪雨1, 郑国平2   

  1. (1. 浙江省交通规划设计研究院, 浙江杭州 310006; 2. 浙江工业大学, 浙江杭州 310014)
  • 收稿日期:2015-05-20 修回日期:2015-10-25 出版日期:2015-11-20 发布日期:2015-11-25
  • 作者简介:吴德兴 (1962—),男,浙江缙云人,1983年毕业于北方交通大学,铁道工程专业,博士,教授级高级工程师,主要从事公路及地下工程方面的科研、设计和咨询工作。

Study on Design of Crosssection of Fuchunjiang Waterway Tunnel

WU Dexing1, ZHOU Hongsheng1, GUO Hongyu1, ZHENG Guoping2   

  1. (1. Zhejiang Provincial Institute of Communications Planning, Design & Research, Hangzhou 310006, Zhejiang, China; 2. Zhejiang University of Technology, Hangzhou 310014, Zhejiang, China)
  • Received:2015-05-20 Revised:2015-10-25 Online:2015-11-20 Published:2015-11-25

摘要:

基于目前国内外对大断面通航隧道的设计和施工尚无可参照的标准规范,以富春江七里泷航道通航隧道工程项目为依托,分析满足隧道水下断面形状要求、水上部分建筑界限要求以及通航隧道安全保障的措施要求,并结合围岩及隧道结构的受力特点,应用最优化方法及相关分析计算,对隧道内轮廓进行优化设计,提出了满足Ⅳ级单线航道的大断面通航隧道断面,综合经济性及结构受力角度合理性考虑推荐采用曲墙式断面。

关键词: 富春江隧道, 大断面, 通航隧道, 建筑限界, 断面设计

Abstract:

So far there is no standard at home and abroad that can be referred to in the design and construction of large crosssection waterway tunnels. In the paper, the design of the crosssection of Fuchunjing waterway tunnel is studied. The requirements for the crosssection of the underwater part of the waterway tunnel, the construction clearance of the abovewater part of the waterway tunnel and the navigation safety guarantee measures are analyzed. Optimization design is made on the inner contour of the waterway tunnel by means of optimization method and analysis, considering the mechanical characteristics of the surrounding rock and the tunnel structure. The crosssection of largesized waterway tunnel that can meet the requirements of Grave IV single shipping lane is proposed. It is suggested that the crosssection with curvedwalls should be adopted, considering the economic efficiency and structure force.

Key words: Fuchunjiang waterway tunnel, large crosssection, construction clearance, crosssection design