• 中国科学引文数据库(CSCD)来源期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国核心学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2021, Vol. 41 ›› Issue (5): 858-864.DOI: 10.3973/j.issn.2096-4498.2021.05.020

• 施工技术 • 上一篇    下一篇

软弱地层敞开式TBM超前注浆加固技术研究

杨腾添1,2, 李恒1, *, 周冠南1, 郭稳1   

  1. 1. 中国铁建大桥工程局集团有限公司, 天津 300300; 2. 陕西省岩土与地下空间工程重点实验室, 陕西 西安 710055)

  • 出版日期:2021-05-20 发布日期:2021-05-29
  • 作者简介:杨腾添(1989—),男,天津人,2018年毕业于西安建筑科技大学,岩土工程专业,博士,工程师,主要从事岩土与地下工程方面工作。E-mail: 737412033@qq.com。*通信作者: 李恒, E-mail: 2213864516@qq.com。

Pregrouting Reinforcement Technology of Open TBM in Soft Stratum

YANG Tengtian1, 2, LI Heng1*, ZHOU Guannan1, GUO Wen1   

  1. (1. China Railway Construction Bridge Engineering Bureau Group Co., Ltd., Tianjin 300300, China; 2. Shaanxi Key Laboratory of Geotechnical and Underground Space Engineering, Xi′an 710055, Shaanxi, China)

  • Online:2021-05-20 Published:2021-05-29

摘要:

为实现敞开式TBM施工过程中隧道围岩的机械化超前加固,降低软弱破碎地层中的隧洞塌方和TBM卡机风险,在传统敞开式TBM的基础上,引入超前钻注一体化装备,并建立配套的TBM超前加固技术。同时,为明确敞开式TBM钻注一体机超前加固效果,以阿勒泰某引水隧洞为背景,采用midas对加固前后敞开式TBM2个特征循环段中的盾顶压应力及围岩变形情况进行分析,并结合实测数据对比研究超前加固技术的可靠性。结果表明: 1)采用超前加固措施效果明显,同一位置处的盾顶压应力降幅达10%~90% 2)实测钢护盾顶部压应力同加固后的数值计算结果变化趋势基本一致,数值差异量控制在20%内,计算结果可靠性较高; 3)采用钻注一体机进行超前注浆加固,能够满足岩体加固的要求,可提高施工效率。

关键词: 引水隧洞, 软弱地层, 钻注一体机, 敞开式TBM, 注浆加固

Abstract: Constructing a tunnel with open tunnel boring machine (TBM) in weak and broken strata results in the risks of tunnel collapse and TBM jamming. To realize mechanized advance reinforcement of tunnel surrounding rock, advanced drilling and grouting integrated equipment is developed and supporting technology of advance TBM reinforcement is established for traditional open TBM. Midas is used to analyze the shieldtop stress of open TBM and surrounding rock deformation before and after reinforcement in two characteristic circulation sections in a waterdiversion tunnel in Altay. The reliability of the advance reinforcement technology is analyzed using the measured data. The results show that: (1) the advance reinforcement measures have significant effects, and the shieldtop compressive stress at the same position decreases by 10%~90%; (2) the changing trend of the measured shieldtop compressive stress after reinforcement is consistent with the numerical calculation results, and the numerical difference is within 20%, indicating the high reliability of the calculation results; (3) the application of drilling and grouting integrated machines in advance grouting reinforcement can meet the requirements of rock reinforcement and greatly improve construction efficiency.

Key words: waterdiversion tunnel, soft stratum, drilling and grouting integrated machine, open TBM, grouting reinforcement

中图分类号: