摘要:
禾洛山隧道是大丽铁路的控制性工程,存在涌水突泥等地质灾害。结合陡坡斜井突发涌水的工程实例,制定了“以堵为主,限量排放”的综合治理措施,在实践中摸索出适合现场的全断面预注浆的详细技术参数和方法,取得了良好的效果,为今后陡坡斜井处理突发涌水提供了借鉴经验。
Abstract:
Heluoshan tunnel, one of the control works on DaliLijiang railway, has such geological disasters as water and mud gushing. The principle of "taking water sealing as dominant measure and releasing the water with limitation" is determined on basis of the actual situation of the sudden water gushing in one steep inclined shaft of Heluoshan tunnel. Detailed technical parameters and methods of fullface pregrouting are established and adopted and satisfactory effects are achieved. The details of the fullface pregrouting are presented in the paper, which can provide reference for similar projects in the future.
中图分类号:
U 455.4
周国龙. 禾洛山隧道陡坡斜井突发性涌水全断面预注浆施工技术[J]. 隧道建设, 2009, 29(增刊2): 148-152,170.
ZHOU Guolong. Fullface Pregrouting to Control Sudden Water Gushing in Steep Inclined Shaft of Heluoshan Tunnel[J]. Tunnel Construction, 2009, 29(增刊2): 148-152,170.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.suidaojs.com/CN/B
http://www.suidaojs.com/CN/Y2009/V29/I增刊2/148