• CSCD核心中文核心科技核心
  • RCCSE(A+)公路运输高质量期刊T1
  • Ei CompendexScopusWJCI
  • EBSCOPж(AJ)JST
二维码

隧道建设(中英文) ›› 2007, Vol. 27 ›› Issue (增刊): 542-547.DOI: B

• 施工技术 • 上一篇    下一篇

台湾雪山隧道主隧道TBM工法

 冷耀东,  谢玉山   

  1. 荣民工程股份有限公司|台北
  • 收稿日期:2007-06-12 出版日期:2007-08-10 发布日期:2010-04-20
  • 作者简介:冷耀东|男|学士|工程师|机械工程。 谢玉山|男|硕士|土木技师|现任荣工公司处长|隧道工程。

TBM Method in Taiwan Hsuehshan Main Tunnel

 LENG Yao-Dong,  Xie-Yu-Shan   

  1. RSEA Engineering Corporation, Taipei
  • Received:2007-06-12 Online:2007-08-10 Published:2010-04-20

摘要:

台湾北宜高速公路雪山隧道长12.9km,两条直径11.74m的主隧道南下、北上线及一条直径4.8m的导坑,原规划均采用全断面隧道钻掘机(以下简称TBM, Tunnel Boring Machine)钻掘施工。由于地处板块冲击区地质复杂多变且地下水极为丰沛,不论以钻炸法施工或以TBM钻掘施工,皆极易发生灾变,断面愈大愈危险,必须事前妥善研拟因应方案及选择适当之TBM,提高警觉小心施工,灾害发生时快速应变并谨慎处理,才能将恶劣地质与涌水灾害损伤减至最小,尤其地质构造上,穿越雪山隧道之断层主要分布在南端(头城)约3.6km的范围内,其断层宽度甚至达50m以上,而雪山隧道因考虑环保水资源保护,施工期的排水、洞口设施的腹地、运弃碴料等之因素,业主决定三条隧道均由南洞口(头城端)以TBM发进向北洞口(坪林端)方向开挖,TBM实际所遭遇的恶劣地质及蕴含丰富的地下水量较所预估之状况更为艰巨险恶。本文叙述雪山主隧道恶劣地质下TBM施工之经验,提供两岸隧道与地下工程界卓参,企盼工程技术与管理,能在恶劣地质困境的考验下,获致进一步的突破与成长。

Abstract:

Taiwan, TaipeiI Lan Expressway Hsuehshan Tunnel, in length of 12.9km, composed of 2 main tunnels (westbound and eastbound) with boring dia. 11.74m and a pilot tunnel with boring dia. 4.8m which were originally planned to be bored by Tunnel Boring Machine (hereinafter called TBM).  Due to the tunnel is located at convergent boundary between the Eurasian plate and the Philippine sea plate along with a great amount of underground water, no matter excavate by Drill & Blast method or TBM method, it may easily cause a disaster, the more bigger crosssection will be the more dangerous, therefore, cautious and proper planning of how to cope with the difficult situation and select a proper TBM prior to the construction, vigilance against any situation during the construction, prompt and correct reaction when a disaster occurs...etc. are the great important issues in this project, so that to keep the damage from atrociously ground and inrushing water to the minimum.  Especially in the geologically structure, most of faults are distributed in 3.6km southern part of the tunnel, the breadth of faults are even reached to 50 meters above, however, in view of the environment constrain, water drainage during the construction, portal facilities area and mucking delivery...etc. all 3 tunnels were originally planned to be bored by TBMs from the southern portal (Touchang) to the northern portal (Pinglin), it pass under the Hsuehshan Ranges in northern Taiwan, in the tunnel horizon, it cut across strong, hard, abrasive and intensely fractured Szeleng Sandstone on the south and indurate sandstone and siltstone on the north, the entire zone heavily affected by tectonically movement is very much faulted and bears a great amount of water, the TBMs actual faced ground conditions were more worth than ever expected.  This paper presents our methodology and experience of Hsuehshan main tunnel TBM mining operation in such poor geological ground condition, provide to the tunneling and underground construction field experts for references, with the hope that technology and technical know how as well as construction management in connection with TBM operation under such ground condition will gain more further development and improvement.

Key words: tunnel boring machine  , poor geological ground condition  , faults

中图分类号: