地铁隧道与邻近高层构筑物建设时序优化研究
收稿日期: 2011-12-28
修回日期: 2012-08-06
网络出版日期: 2012-10-30
Optimization of Construction Order of Metro Tunnel and Adjacent High Building
Received date: 2011-12-28
Revised date: 2012-08-06
Online published: 2012-10-30
王超,吴小丽 . 地铁隧道与邻近高层构筑物建设时序优化研究[J]. 隧道建设, 2012 , 32(5) : 631 -642 . DOI: 10.3973/j.issn.1672-741X.2012.05.004
Key words: Wuhan Metro; Metro tunnel; high building; construction order; numerical simulation
/
| 〈 |
|
〉 |