- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
深埋连拱隧道荷载计算方法的探讨
收稿日期: 2012-11-07
修回日期: 2013-03-18
网络出版日期: 2013-05-16
基金资助
国家高技术研究发展计划(863计划) (2012AA112502);交通运输部西部交通建设科技项目(200731879980)
Discussion on Load Calculation Methods of Deepburied Multiarch Tunnels
Received date: 2012-11-07
Revised date: 2013-03-18
Online published: 2013-05-16
黎敬俊 , 丁文其 , 魏新欣 . 深埋连拱隧道荷载计算方法的探讨[J]. 隧道建设, 2013 , 33(5) : 383 -387 . DOI: 10.3973/j.issn.1672-741X.2013.05.009
In this paper, the authors point out the problems in the existing calculation methods for the vertical loads of deepburied multiarch tunnels. Based on double ground arching method and the method provided in Design Rules of Highway Tunnel, the authors get the corrected load calculation method and the value of the additional correction coefficients. Then the authors make a comparative analysis on the calculation results of vertical loads under the condition of two lane highways and three lane highways. The result obtained by the corrected load calculation method is close to that obtained by the method provided in Design Rules of Highway Tunnel. The corrected load calculation method should be recommended for future application. At last, the formula has been applied in the calculation of the loads of Baziling tunnel and Nashaling tunnel, which demonstrates that the formula is rational.
/
| 〈 |
|
〉 |