狮子洋隧道盾构对接方案的模糊判断法
收稿日期: 2013-04-02
修回日期: 2013-08-08
网络出版日期: 2013-09-18
Fuzzy Evaluation of the Shield Docking Plan in the Construction of the Shiziyang Tunnel
Received date: 2013-04-02
Revised date: 2013-08-08
Online published: 2013-09-18
王连山 , 奚正平 . 狮子洋隧道盾构对接方案的模糊判断法[J]. 隧道建设, 2013 , 33(9) : 731 -734 . DOI: 10.3973/j.issn.1672-741X.2013.09.005
There are many determining factors and uncertain boundary conditions in the design of a shield docking plan in a long tunnel construction. In this paper, quantitative analysis is made on the shield docking plan for the construction of the Shiziyang tunnel of the GuangzhouShenzhenHongkong passenger railway, by calculating the limit values of the object functions on the basis of fuzzy mathematics’ membership function. Three shield docking plans, i.e., the mechanical docking plan, the directboring docking plan and the groundconsolidation docking plan, are compared in terms of equipment requirement, ground consolidation requirement, safety, quality and economic efficiency. The advantages of the directboring docking plan, which was adopted in the construction of the tunnel, are analyzed.
Key words: tunnel; shield docking; fuzzy mathematics; directboring docking
/
| 〈 |
|
〉 |