Analysis on Behavior of Shieldbored Metro Tunnel Caused by Construction of Largescale Foundation Pit Located Above: Case Study on Foundation Pit of West Square Hangzhou East Railway Station
Received date: 2013-05-27
Revised date: 2013-09-18
Online published: 2013-11-15
张迪 . 杭州铁路东站西广场大基坑开挖对其下地铁盾构隧道的影响与控制[J]. 隧道建设, 2013 , 33(11) : 897 -902 . DOI: 10.3973/j.issn.1672-741X.2013.11.001
West Square of Hangzhou East Railway Station is a twostory largescale underground space developing project. With 10 m depth, the foundation pit is located above the running tunnel of Line 1 of Hangzhou Metro, with 673 m vertical clearance and 358 m influence length. In order to guarantee the safety of the operating Metro tunnel, layerbylayer and sectionbysection cutting of the foundation pit is simulated by FLAC 3D to evaluate the deformation and stress conditions of the Metro tunnel during foundation pit construction. It is concluded that layerbylayer and sectionbysection cutting of the foundation pit will not cause damage to the Metro tunnel. Furthermore, requirements for the monitoring of the Metro tunnel is proposed. The monitoring results show that layerbylayer and sectionbysection cutting of the foundation pit can guarantee the safe operation of the Metro tunnel.
/
| 〈 |
|
〉 |