盾构隧道侧穿高铁桥梁桩基的影响分析与措施
收稿日期: 2014-04-10
修回日期: 2014-05-27
网络出版日期: 2014-08-11
Study on Influence of Shieldbored Tunnel Adjacent to Piles of Highspeed Railway Bridge and Countermeasures
Received date: 2014-04-10
Revised date: 2014-05-27
Online published: 2014-08-11
姚西平 , 宫全美 , 陈长江 , 刘东坡 , 程云妍 . 盾构隧道侧穿高铁桥梁桩基的影响分析与措施[J]. 隧道建设, 2014 , 34(增刊) : 159 -165 . DOI: 10.3973/j.issn.1672-741X.2014.S.026
In this article, the FEM 3D numerical simulation is built to analyze the internal forces and deformations of piles, with a shieldbore tunnel crossing adjacent to piles of highspeed railway bridge. The results show that piles move deviate from the tunnel in horizontal direction after the tunneling in moderately weathered argillaceous siltstone. The piles’ maximal horizontal displacement is 0.24 mm, the greatest settlement of pile cap’s centre is 0.52 mm, the largest additional internal axial force of piles is 230 kN. As both the deformation and bearing capacity of the piles could meet the specification requirements, no active reinforcement is conducted. The paper proposed the precautions and safety measures when the shield tunnel conducted closely under the pile of highspeed railway bridge based on the previous tunneling experiment. Besides, the rationality of the simulation is demonstrated by the accordance between the computed result and practical monitoring data.
/
| 〈 |
|
〉 |