大断面土压平衡盾构穿越建筑物施工技术研究
收稿日期: 2013-10-10
修回日期: 2014-06-06
网络出版日期: 2014-08-11
Construction Technologies for Large Crosssection EPB Shield Boring underneath Existing Buildings: Case Study on Bingjiangxincheng StationKaifusi Station Section of ChangshaZhuzhouXiangtan Railway
Received date: 2013-10-10
Revised date: 2014-06-06
Online published: 2014-08-11
马林坡 , 任成国 . 大断面土压平衡盾构穿越建筑物施工技术研究[J]. 隧道建设, 2014 , 34(增刊) : 286 -291 . DOI: 10.3973/j.issn.1672-741X.2014.S.044
The 9.34 m diameter EPB shield machines are used for boring of Bingjiangxincheng StationKaifusi Station section of ChangshaZhuzhouXiangtan railway. The active protection of buildings on the ground and optimization of construction program and parameters are used, so as to control the settlement and deformation of buildings. In the end, the shield machines have successfully passed through, the settlement of ground surface has been brought under effective control, and the safety of the buildings on the ground has been guaranteed.
/
| 〈 |
|
〉 |