- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2014-07-02
修回日期: 2014-08-19
网络出版日期: 2014-12-17
基金资助
国家科技支撑计划(2013BAB10B01)
Optimization of Arrangement of Thrust Cylinders of Dualmode Shield for Inclined Tunnel
Received date: 2014-07-02
Revised date: 2014-08-19
Online published: 2014-12-17
陶伟 , 管会生 , 郭立昌 , 黄松和 . 斜井隧道双模式盾构推进油缸布局优化研究[J]. 隧道建设, 2014 , 34(12) : 1207 -1214 . DOI: 10.3973/j.issn.1672-741X.2014.12.015
Rational arrangement of thrust cylinders of shields plays an important role in ensuring the segment erection quality, especially in the case of inclined tunnels. In the paper, the conditions for the optimization of the arrangement of the thrust cylinders of a dualmode shield are analyzed, the principle for the optimization of the thrust cylinders, i.e., uniform force on each individual segment, balanced force on the segment ring and minimum mean square error of force of each zone, are analyzed. The positions and zoning of the thrust cylinders are determined and good results have been achieved. The study can provide reference for the type selection and design of thrust systems of shields of similar projects in the future.
/
| 〈 |
|
〉 |