城际铁路暗挖隧道下穿地表建筑物非爆破施工技术
收稿日期: 2015-05-26
修回日期: 2015-07-01
网络出版日期: 2015-12-24
Nonblasting Construction Technologies for Mined Tunnel Crossing Underneath Buildings: Case Study on A Mined Section on ChangshaZhuzhouXiangtan Intercity Railway
Received date: 2015-05-26
Revised date: 2015-07-01
Online published: 2015-12-24
刘军伟 , 曹胜利 . 城际铁路暗挖隧道下穿地表建筑物非爆破施工技术[J]. 隧道建设, 2015 , 35(S2) : 91 -96 . DOI: 10.3973/j.issn.1672-741X.2015.S2.016
The Changsha Municipal Government StationLeifengdadao Station mined section on ChangshaZhuzhouXiangtan intercity railway has to cross underneath Xiyuan Hotel on the ground. A series of technologies, including using hydraulic fracturing machine,milling machine, hydraulic hammer and submersible drilling rig + hydraulic hammer, have been adopted and put into comparison. In the end, the method of submersible drilling rig + hydraulic hammer is chose, and the safety of building is guaranteed.
/
| 〈 |
|
〉 |