施工技术

天目山隧道施工废水特征分析及处理

  • 刘伟 ,
  • 付海陆 ,
  • 耿伟 ,
  • 庞伟 ,
  • 曾爱斌 ,
  • 官宝红
展开
  • (1. 中铁隧道集团有限公司杭州公司, 浙江杭州 310030; 2. 中国计量大学, 浙江杭州 310018; 3. 杭州万向职业技术学院, 浙江杭州 310023; 4. 浙江大学, 浙江杭州 310058)
刘伟(1972—),男,浙江杭州人,1994年毕业于西南交通大学,铁路工程专业,本科,高级工程师,从事隧道及地下工程施工管理工作。Email: 258626748@qq.com。 *通讯作者: 付海陆, Email: hlfu@cjlu.edu.cn。

收稿日期: 2017-03-17

  修回日期: 2017-06-09

  网络出版日期: 2017-07-26

Characteristic Analysis and Treatment of Construction Wastewater of Tianmushan Tunnel

  • LIU Wei ,
  • FU Hailu ,
  • GENG Wei ,
  • PANG Wei ,
  • ZENG Aibin ,
  • GUAN Baohong
Expand
  • (1. Hangzhou Branch of China Railway Tunnel Group Co., Ltd., Hangzhou 310030, Zhejiang, China; 2. China Jiliang University, Hangzhou 310018, Zhejiang, China; 3. Hangzhou Wanxiang Polytechnic, Hangzhou 310023, Zhejiang, China; 4. Zhejiang University, Hangzhou 310058, Zhejiang, China)

Received date: 2017-03-17

  Revised date: 2017-06-09

  Online published: 2017-07-26

摘要

天目山隧道进口段毗邻“新安江—富春江—千岛湖”国家级风景名胜区,为避免隧道施工废水影响当地生态环境和饮水安全,对其特征进行分析,发现废水中悬浮物(SS)和酸碱度(pH)超标,且含有重金属。部分水样中汞(Hg)和镍(Ni)超标(其中Hg的超标频次较高),其他重金属未超标,废水中出现重金属与地质有关。采用“初沉+混凝+沉淀+过滤”工艺处理废水,初沉主要去除大颗粒悬浮物,混凝、沉淀主要去除细颗粒物和重金属。结果表明: 处理后的废水各指标均满足排放要求,处理成本为0.51元/m3,经济性较好。

本文引用格式

刘伟 , 付海陆 , 耿伟 , 庞伟 , 曾爱斌 , 官宝红 . 天目山隧道施工废水特征分析及处理[J]. 隧道建设, 2017 , 37(7) : 845 -850 . DOI: 10.3973/j.issn.1672-741X.2017.07.010

Abstract

The entrance of Tianmushan Tunnel is adjacent to the national scenic area of “Xin’an RiverFuchun RiverQiandao Lake”. The protection of the safety of local ecological environment and drinking water is very important. As a result, the characteristics of construction wastewater of Tinmushan Tunnel are analyzed; the results show that the suspended solids (SS) and power of hydrogen (pH) in wastewater exceed the limit. The heavy metals related to the engineering geology are detected in the wastewater, which do not exceed the limit except mercury (Hg) and nickel (Ni) in some of water samples. The wastewater treatment method of “primary setting + coagulation + sediment + filtration” is adopted. The suspended solids with large particle size can be removed by primary setting process; and the fine particulate matter and the heavy metals can be removed by coagulation and sediment process. The application results show that the quality of construction wastewater after treatment can meet relevant requirements; meanwhile, the treatment cost of the wastewater per cubic meter is RMB 0.51, so as to show beffer economical benefit.