- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2018-12-12
网络出版日期: 2019-09-12
Investigation on Jacking Force Parameters of Curved Piperoofing Construction in Gongbei Tunnel
Received date: 2018-12-12
Online published: 2019-09-12
熊昊翔 , 许晴爽 , 任辉 . 拱北隧道曲线管幕顶管顶力参数取值研究[J]. 隧道建设, 2019 , 39(S1) : 146 -151 . DOI: 10.3973/j.issn.2096-4498.2019.S1.021
36 curved curtain pipes with a diameter of 1.62 m and a length of 255 m are used as the advanced support for Gongbei Tunnel of Hong KongZhuhaiMacao Bridge to cross Gongbei Port. In order to solve the huge gap between the calculated value of pipe jacking force and the measured value, relying on the piperoofing project of Gongbei tunnel, three formulas, i.e. Standard, Shimada and JMTA are used to calculate the theoretical pipe jacking force. At the same time, the formula calculation parameters are divided into pipe parameters, soil parameters and empirical parameters according to the source. Taking the Standard formula as an example, the calculation of the jacking force is studied from the perspective of whether the empirical parameters are reasonable. Through the comparison of empirical parameters and the calculated values of the jacking force before and after the adjustment with empirical parameters, it is considered that the adjustment of empirical parameters is feasible, and the suggestions for the optimization of empirical parameters are given.
/
| 〈 |
|
〉 |