- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
设置站前交叉渡线初期终点站的近远期折返能力适应性研究 ———以南宁地铁2 号线2 期工程坛泽站为例
收稿日期: 2019-08-12
网络出版日期: 2020-04-09
Adaptability of Short-term and Long-term Turnback Capacity of Preliminary Terminal with Double Crossover: a Case Study on Tanze Station of Phase 2 Project of Nanning Metro Line No. 2
Received date: 2019-08-12
Online published: 2020-04-09
陈骏 , 袁江 , 王芳玲 . 设置站前交叉渡线初期终点站的近远期折返能力适应性研究 ———以南宁地铁2 号线2 期工程坛泽站为例[J]. 隧道建设, 2020 , 40(3) : 389 -396 . DOI: 10.3973/j.issn.2096-4498.2020.03.011
Key words: metro; double crossover; return capacity; terminal; operational adaptability
/
| 〈 |
|
〉 |