土岩“二元基坑”吊脚桩支护体系锁脚锚杆预加轴力计算方法研究

  • 陈诚 ,
  • 杨红林
展开
  • (1. 广州地铁设计研究院股份有限公司, 广东 广州 510010;2. 上海市隧道工程轨道交通设计研究院, 上海 200292)

陈诚(1990—),男,安徽安庆人,2016年毕业于山东大学,建筑与土木工程专业,硕士,工程师,现从事轨道交通车站结构设计工作。E-mail: chenchengsdu@163.com。

网络出版日期: 2020-10-31

基金资助

中国博士后科学基金面上项目(2019M652383); 重庆市教委科学技术研究项目(KJ1712304); 长江师范学院校级项目(2016XJQN13)

Study on Calculation Method of Preloaded Axial Force of Footlock Anchor in Support System of Soil and Rock Dualistic Foundation Pit EndSuspended Pile

  • CHEN Cheng ,
  • YANG Honglin
Expand
  • (1.Guangzhou Metro Design & Research Institute Co., Ltd., Guangzhou 510010, Guangdong, China; 2. Shanghai Tunnel Engineering & Rail Transit Design and Research Institute, Shanghai 200292, China)

Online published: 2020-10-31

摘要

为解决土岩二元基坑吊脚桩支护体系中吊脚桩、岩肩与锁脚锚杆之间的相互作用力学机制,根据吊脚桩桩底位于岩质边坡潜在滑动面的位置,分别提出锁脚锚杆预加轴力的计算方法: 1)当吊脚桩位于潜在滑动面以下位置时,锁脚锚杆的预加轴力等于岩层基坑未开挖时的被动区合力减去岩肩能提供的反力; 2)当吊脚桩位于潜在滑动面以上位置时,锁脚锚杆的预加轴力等于滑块对吊脚桩嵌固段的推力加上岩层基坑未开挖前被动区的土压力。并给出2种工况下锁脚锚杆预加轴力的计算公式。最后通过有限元方法进行数值验证。结果表明: 按照提出的计算方法得到的锁脚锚杆预加轴力基本合理。

本文引用格式

陈诚 , 杨红林 . 土岩“二元基坑”吊脚桩支护体系锁脚锚杆预加轴力计算方法研究[J]. 隧道建设, 2020 , 40(10) : 1441 -1447 . DOI: 10.3973/j.issn.2096-4498.2020.10.007

Abstract

The interaction mechanics among the endsuspended pile, rock shoulder and footlock anchor should be studied. Hence, the calculation methods of preloaded axial force of the footlock anchor are proposed based on the positions of endsuspended pile at the bottom of potential sliding surface of rock slope. When the endsuspended pile is located below the potential sliding surface, the preloaded axial force of footlock anchor is equal to the passive zone combined force minus rock shoulder reaction force when the rock foundation pit is not excavated. When the endsuspended pile is above the potential sliding surface, the preloading axial force of footlock anchor is equal to the passive zone combined force plus the thrust of endsuspended pile when the rock foundation pit is not excavated. And the calculation formulas of the preloaded axial force of footlock anchor under two conditions are given. Finally, the results are verified by the finite element method. The results show that the calculation results of the preloaded axial force of footlock anchor according to the calculation methods are basically rational.