深埋富水岩体隧道三台阶法施工数值模拟和参数优化——以正盘台隧道工程为例
网络出版日期: 2021-08-28
Numerical Modeling and Parametric Optimization of ThreeBench Construction Method for Zhengpantai Deep Tunnel in WaterRich Rocks
Online published: 2021-08-28
林可夫, 项彦勇
.
深埋富水岩体隧道三台阶法施工数值模拟和参数优化——以正盘台隧道工程为例
To conduct parameter optimization for threebench construction method of tunnels in deep waterrich rocks, the Zhengpantai tunnel of the Chongli highspeed railway is taken for an example to carry out surrounding rock stability analysis and parameter optimization using three level orthogonal tests of fluidsolid coupling numerical simulation considering the height of the heading, the length of the upper bench, the length of the lower bench, and the advancement step length as the parameters. The results show that: (1) The height of heading has an obvious influence on the crown settlement, the wall displacement, the intrusive displacement of the face, and the scope of the plastic zone. (2) In the grade Ⅳ rocks, the excavation height of the upper bench is 27.8% of the excavation span, reaching 4 m, and the upper bench and the lower bench length is 55.6% of the excavation span, reaching 8 m, and the length of advancement step is 20.8% of the excavation span, reaching 3 m.
/
| 〈 |
|
〉 |