白鹤滩水电站地下厂房错动带围岩稳定性控制方法研究

  • 朱永生 ,
  • 褚卫江 ,
  • 万祥兵 ,
  • 欧阳秋平 ,
  • 何炜 ,
  • 王鹏飞
展开
  • (1. 中国电建集团华东勘测设计研究院有限公司, 浙江 杭州 311122; 2. 浙江中科依泰斯卡岩石工程研发有限公司, 浙江 杭州 311122; 3. 中国三峡建设管理有限公司, 北京 610042)
朱永生(1981—),男,安徽舒城人,2006年毕业于西南交通大学,桥梁与隧道工程专业,硕士,高级工程师,现主要从事地下工程、边坡工程相关岩石力学咨询工作。E-mail: yzhu@itasca.cc。

网络出版日期: 2022-01-28

基金资助

国家自然科学基金(U1865203)

Surrounding Rock Stability Control Methods in Shear Bands of Underground Powerhouse of Baihetan Hydropower Station

  • ZHU Yongsheng ,
  • CHU Weijiang ,
  • WAN Xiangbing ,
  • OUYANG Qiuping ,
  • HE Wei ,
  • WANG Pengfei
Expand
  • (1. HydroChina Huadong Engineering Corporation Limited, Hangzhou 311122, Zhejiang, China; 2. HydroChina Itasca R&D Center, Hangzhou 311122, Zhejiang, China; 3. China Three Gorges Projects Development Co., Ltd., Beijing 610042, China)

Online published: 2022-01-28

摘要

软弱错动带C2、C4分别加剧了白鹤滩两岸主厂房围岩的变形破坏风险和程度,为研究错动带影响机制和特点,制定针对性控制措施,依据现场破坏现象、监测数据,结合理论分析和数值反馈方法考察左厂边墙揭露C2、右厂顶拱揭露C4 2种条件下的围岩开挖力学响应特点和破坏机制,提出错动带不利影响控制措施,并评价工程措施的有效性及其相应条件下的厂房稳定条件。研究结果表明: 1)由主洞+支洞联合抗剪、交叉锁口构成的组合措施,可有效控制沿C2发生的剪切变形对左岸主厂房边墙松弛变形的加剧效应; 2)错动带C4在构造运动中形成局部地层应力异常并与开挖二次应力叠加作用,导致右岸主厂房顶拱层高应力破坏风险增加; 3)强化表面支护+深部加固组合措施可对C4影响部位的浅层和深部围岩综合起到“维持”和“加固”作用。系统支护和错动带组合控制措施可有效保证主厂房整体稳定性。

本文引用格式

朱永生 , 褚卫江 , 万祥兵 , 欧阳秋平 , 何炜 , 王鹏飞 . 白鹤滩水电站地下厂房错动带围岩稳定性控制方法研究[J]. 隧道建设, 2022 , 42(1) : 48 -56 . DOI: 10.3973/j.issn.2096-4498.2022.01.007

Abstract

The shear bands C2 and C4 aggravate the risk of deformation and failure of the surrounding rock of Baihetan main powerhouses. As a result, corresponding control measures must be developed. According to field failure phenomena and monitoring data, the response characteristics and failure mechanism of surrounding rock under the conditions of C2 exposing at the sidewall of the left plant and C4 exposing at the roof arch of the right plant are investigated using theoretical analysis and numerical feedback methods. Some control measures for the adverse impact of the shear band are proposed, and corresponding evaluations of the effectiveness of measures taken are conducted. The research results show the following: (1) The combination measures of main shear resistance tunnel and branch tunnel combined with cross lock can effectively control the aggravating effect of shear deformation along with C2 on the relaxation deformation of the sidewall of the main powerhouse at the left bank. (2) The superposition of abnormal stress locally induced by C4 during tectonic movement and excavation secondary stress increases the risk of stressinduced damage to the roof arch layer of the right bank′s main powerhouse. (3) Surface support and deep reinforcement measures combined can provide "maintenance" and "reinforcement" to the shallow and deep surrounding rock affected by C4. The results show that shear band system support and control measures can ensure the overall stability of the main powerhouse.