为研究因顶管施工的挤土效应对邻近高架桥基桩水平变形的影响,以无锡地铁青石路段1号地铁出入口为例,采用MIDAS GTS软件模拟浅覆土条件下矩形顶管顶进施工,计算在不同的顶管顶进距离、基桩与隧道间净距,以及不同的顶管开挖面顶进压力、管节与土体间摩阻力条件下的基桩水平变形。结果表明: 1)矩形顶管顶进施工时会造成邻近基桩发生沿顶进方向和垂直顶进方向的水平变形,且以沿顶进方向的水平变形为主; 2)不同于其他矩形顶管工程,浅覆土条件下基桩受顶管施工的影响范围约为隧道外4D(D为矩形顶管长边尺寸),基桩的水平变形随着净距的减小而增大,且当净距小于2D时,其水平变形呈非线性快速增加; 3)相对于开挖面顶进压力,管节与土体之间的摩阻力对基桩的影响更大,其水平位移变化可分为线性增长和非线性增长2个阶段。
To investigate the influence of horizontal deformation
of foundation pile adjacent to viaduct caused by soil squeezing effect of pipe
jacking construction, a case study is conducted on the entrance and exit
section of No.1 metro on Qingshi road in Wuxi, China. Furthermore, the Midas
GTS software is used to simulate the construction process of rectangular pipe
jacking under the condition of shallowburied soil, and the
horizontal deformation of foundation piles under various jacking distance,
clear space between the foundation pile and the tunnel, jacking pressure of the
excavation face, and friction between pipe joint and soil is calculated. The
results reveal the following: (1) The adjacent piles will deform along the
jacking direction and vertical jacking direction during the jacking
construction of rectangular pipe jacking, and the deformation is mainly along
the jacking direction. (2) The influence range of pile jacking construction
under the condition of shallowburied soil is about 〖WT〗4D 〖WT5《TNR》〗outside the
tunnel 〖WT〗(D 〖WT5《TNR》〗is the long side size of rectangular pipe jacking), and the
horizontal deformation of pile increases with a decrease in clear space; when
the clear space is less than 〖WT〗2D, 〖WT5《TNR》〗the
horizontal deformation of the pile increases nonlinearly and rapidly. (3) The
friction between the pipe joint and the soil has a greater impact on the
foundation pile than jacking pressure of the excavation face, and the increase
of the horizontal displacement can be divided into two stages, i.e., linear and
nonlinear growth.