复杂环境条件下洞桩法暗挖车站导洞内降水方案研究——以北京地铁8号线王府井站为例
李铁生, 郝志宏, 李松梅, 汪玉华
Study on Schemes of Dewatering from Heading of Metro Stations Constructed by PBA Method in Complex Environment: Case Study on Wangfujing Station of Beijing Metro
LI Tiesheng, HAO Zhihong, LI Songmei, WANG Yuhua
隧道建设
.
2015, (6): 559
-564
.
DOI: 10.3973/j.issn.1672-741X.2015.06.011