• CSCD核心中文核心科技核心
  • RCCSE(A+)公路运输高质量期刊T1
  • Ei CompendexScopusWJCI
  • EBSCOPж(AJ)JST
二维码
北京地铁14号线高家园站—望京站区间单洞双线盾构临近穿越群桩的响应与防护
黄爱军
Response of Existing Bridge Piles Induced by Shield Boring and Countermeasures: Case Study on Construction of Running Tunnel from Gaojiayuan Station to Wangjing Station on Line 14 of Beijing Metro
HUANG Aijun
隧道建设 . 2015, (10): 997 -1002 .  DOI: 10.3973/j.issn.1672-741X.2015.10.004