地铁施工盾构空推过既有矿山法隧道施工组织设计——以广州地铁6号线二期工程为例
邓洋
Organization Design of Shield Crossing Existing Mined Tunnel without Load:Case Study on Phase 2 Project on No. 6 Line of Guangzhou Metro
DENG Yang
隧道建设
.
2015, (S2): 138
-142
.
DOI: 10.3973/j.issn.1672-741X.2015.S2.024