设置站前交叉渡线初期终点站的近远期折返能力适应性研究
———以南宁地铁2 号线2 期工程坛泽站为例
陈骏, 袁江, 王芳玲
Adaptability of Short-term and Long-term Turnback Capacity of
Preliminary Terminal with Double Crossover: a Case Study
on Tanze Station of Phase 2 Project of Nanning Metro Line No. 2
CHEN Jun, YUAN Jiang, WANG Fangling
隧道建设
.
2020, (3): 389
-396
.
DOI: 10.3973/j.issn.2096-4498.2020.03.011