复杂地层中盾构掘进速度的调控分析——以新建铁路横琴至珠海机场段HJZQ-2标隧道工程为例
朱小藻
Analysis of EPB Shield Advancing Speed Control in
Composite Strata: a Case Study on Tunnel Project of
HJZQ2 Bid of Newlybuilt HengqinZhuhai Airport Section
ZHU Xiaozao
隧道建设
.
2020, (S1): 107
-114
.
DOI: 10.3973/j.issn.2096-4498.2020.S1.014