土压平衡盾构长距离施工运输模型应用研究——以北京地铁新机场线一期工程为例
杨志勇, 白志强, 李元凯, 高洪吉, 江玉生, 孙伟, 孙正阳
Application of LongDistance Construction and
Transportation Model of Earth [JP3]Pressure
Balance Shield Used in Phase 1 Project of Beijing Metro New Airport Line
YANG Zhiyong, BAI Zhiqiang, LI Yuankai, GAO Hongji, JIANG Yusheng, SUN Wei, SUN Zhengyang
隧道建设
.
2022, (8): 1428
-1434
.
DOI: 10.3973/j.issn.2096-4498.2022.08.012