长距离隧道全施工期压入式通风系统运行策略分析
张浩, 徐琳, 刘杰, 于伟, 王仕慧, 解富强
Fan Operation Strategy for Pressed-in Ventilation Systems Throughout Construction Period of Long Tunnels
ZHANG Hao, XU Lin, LIU Jie, YU Wei, WANG Shihui, XIE Fuqiang
隧道建设
.
2026, (8): 1715
-1728
.
DOI: 10.3973/j.issn.2096-4498.2026.08.011
|
|
|