• 中国科学引文数据库(CSCD)来源期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国核心学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2013, Vol. 33 ›› Issue (5): 337-342.DOI: 10.3973/j.issn.1672-741X.2013.05.001

• 专家论谈 •    下一篇

论跨江越海建设隧道的技术优势与问题

孙钧1,2,3   

  1. (1.同济大学隧道与地下工程研究所, 上海 200092; 2.上海城建集团院士工作研究室, 上海 200122; 3.杭州丰强土建工程研究院, 浙江杭州 310008)
  • 收稿日期:2013-03-15 出版日期:2013-05-20 发布日期:2013-05-16

Study on Technological Advantages and Problems in Construction  of Tunnels Crossing Rivers and Seas

SUN Jun1,2,3   

  1. (1. Institute of Tunnel and Underground Engineering, Tongji University, Shanghai 200092, China; 2. Academician Working and Research Office, Shanghai Urban Construction Group, Shanghai 200122, China; 3. Hangzhou Fengqiang Civil Engineering Research Institute, Hangzhou 310008, Zhejiang, China )
  • Received:2013-03-15 Online:2013-05-20 Published:2013-05-16

摘要:

为商榷在以往规划跨江越海工程时对修建隧道方案有些场合只是作为修建桥梁方案的一种备选方案的观念,文中论证了修建水下隧道在技术、方法、经济等方面的优势、特色及其存在的问题与不足,使业界可较为全面而客观地认识水下隧道在跨江越海工程中的地位。通过列举国内若干典型的已建、在建和正在进行方案研讨的水下隧道工程,从理论和实践经验出发提出了适合建桥、建隧以及桥隧结合方案有关的江床地形地貌、工程地质、水文地质和当地实际条件,对修建桥梁和修建水下隧道方案进行了比较,分析了二者的优缺点、适用场合和局限性;通过列举水下高速铁路、公路隧道的典型范例,总结了适合修建水下隧道的有利条件,并对水下隧道施工和运营过程中出现的诸多困难和问题进行了分析讨论。认为: 在规划跨江越海工程时,应综合当地的自然、生态、地质、水文、河工、港口、航道和航运等诸相关条件,通过多方案比较,更加客观地妥慎优选适合各具体工程的最佳方案;水下建隧的优缺点共存,水下隧道有其独特的技术、经济优越性,事实上现已被越来越多的跨江越海工程所采用。

关键词: 跨江越海工程, 水下隧道, 建桥方案, 琼州海峡大通道, 台湾海峡大通道, 港珠澳大通道, 水下高速铁路隧道, 方案比较

Abstract:

At some occasions in the past, tunnel solution was only an alternative for bridge solution in planning corridors crossing rivers and seas. In the paper, the advantages, features and problems of building underwater tunnels are discussed, which provides a complete and objective view on the function of underwater tunnels in construction of corridors crossing rivers and seas. Typical underwater tunnels built, under construction and under study are listed, and river/sea bed terrain, engineering geology, hydrogeology and other site conditions, where bridges, tunnels or “bridges + tunnels” are suitable to be built, are proposed. Analysis is made on the bridge solution and the tunnel solution in terms of advantages, disadvantages, applicable conditions and its limitations. Some typical underwater highspeed railway and highway tunnels are listed, the favorable conditions to build underwater tunnels are summarized and the problems in the construction and operation stages of underwater tunnels are analyzed. Conclusions drawn are as follows: In planning corridors crossing rivers and seas, comparisons shall be made among different alternatives, considering the natural conditions, ecological conditions, geological conditions, hydrological conditions, river conditions, harbor conditions, waterway conditions and shipping conditions of the site, so as to find out the optimum solution. Underwater tunnels have their own advantages and disadvantages. Due to the unique technological and economical advantages, in fact, underwater tunnels have already been adopted in more and more corridors crossing rivers and seas.

Key words: corridors crossing rivers and seas, underwater tunnel, bridge solution, Qiongzhou strait crossing corridor, Taiwan strait crossing corridor, Hong KongZhuhaiMacao Link, underwater highspeed railway tunnel, alternative analysis