取芯水平钻探对川藏铁路隧道施工效率的影响研究

付伟   

  1. (中铁第一勘察设计院集团有限公司, 陕西 西安 710043)
  • 出版日期:2021-07-20 发布日期:2021-07-29
  • 作者简介:付伟(1981—),男,贵州遵义人,2005年毕业于西南交通大学,地质工程专业,本科,高级工程师,主要从事铁路、地铁等工程的地质勘察及超前地质预报工作。E-mail: 89687836@qq.com。
  • 基金资助:
    国家自然科学基金项目(42077263); 中铁第一勘察设计院集团有限公司科研项目(川藏19-04)

Influence of Horizontal Core Drilling on Tunnel Construction Efficiency of SichuanTibet Railway

FU Wei   

  1. (China Railway First Survey and Design Institute Group Co., Ltd., Xian 710043, Shaanxi, China)

  • Online:2021-07-20 Published:2021-07-29

摘要: 为研究川藏铁路深埋隧道超长水平钻探实施的可行性及复杂地质条件下水平钻探对隧道施工的影响程度,在川藏铁路隧道勘察设计中开展大量调研工作及地表超长深埋水平钻探试验,并结合隧道掘进指标、钻探速度,研究钻爆法及TBM施工中超长超前水平钻探对隧道掘进效率的影响程度。研究结果表明: 1)在单位长度内,围岩地质条件越好,钻探深度越大,隧道掘进速度越快,超前水平钻探对施工影响越大。2)在Ⅱ、Ⅲ级围岩地段,在TBM设备后方180 m处实施超前水平钻探时,水平钻探进度难以追赶TBM施工进度,钻探对施工指导意义相对较小; 在Ⅳ、Ⅴ级围岩地段,水平钻探进度可以很快追赶上TBM施工进度,在TBM施工受阻等复杂地质条件下,采取水平钻探技术对指导隧道施工有一定意义。3)在护盾处开展长距离连续水平钻探时,对隧道施工的影响程度最大可达85.11%,影响较大。综合分析表明,超前水平钻探在断层破碎带、强富水及高压富水、岩溶等不良地质地段实施较为合适。

关键词: 川藏铁路隧道, 钻爆法, TBM, 超前水平钻探, 施工效率

Abstract: A substantial amount of research work and superlong and deepburied horizontal drilling tests have been conducted on the survey and design of the SichuanTibet railway to study the feasibility of implementing superlong horizontal drilling in the deepburied tunnel of the SichuanTibet railway and the influence of horizontal drilling on tunnel construction under complex geological conditions. According to the tunneling index and drilling speed, the influence of superlong advance horizontal drilling on the construction period by drilling and blasting and tunnel boring machine (TBM) methods is studied. The results reveal the following: (1) In unit length, the better the geological conditions of surrounding rock, the deeper the drilling depth and the faster the tunneling speed, and the greater the influence of advance horizontal drilling on the construction. (2) When advance horizontal drilling is carried out 180 m behind TBM equipment in the surrounding rock of grades and , horizontal drilling progress is difficult to keep up with the TBMs construction speed, and the significance of drilling for construction guidance is relatively small. Whereas in the surrounding rock of grades and , it can catch up with the TBM construction tunnel face by a certain distance, making it crucial to guide the tunnel construction in complicated geological conditions such as when TBM construction is interrupted. (3) Longdistance continuous horizontal drilling at the shield has the greatest impact on the tunnel construction, accounting for up to 85.11% of the total. Comprehensive analysis shows that advance horizontal drilling is better suited in the fault fracture zone, strong and highpressure waterrich, karst, and other unfavorable geological sections.

Key words: SichuanTibet railway tunnel, drilling and blasting method, tunnel boring machine (TBM), advance horizontal drilling; construction efficiency analysis