隧道建设(中英文) ›› 2025, Vol. 45 ›› Issue (4): 719-729.DOI: 10.3973/j.issn.2096-4498.2025.04.006

• 研究与探索 • 上一篇    下一篇

河床冲淤作用下运营期水下大直径盾构隧道结构响应分析

黄俊1, 安平2, *, 董飞1, 沈阳3, 赵光1, 陈喜坤1   

  1. 1. 苏交科集团股份有限公司城市建设与轨道交通设计院, 江苏 南京 210019 2. 河海大学, 江苏 南京 210098;3. 南京市交通建设投资控股(集团)有限责任公司, 江苏 南京 210018)

  • 出版日期:2025-04-20 发布日期:2025-04-20
  • 作者简介:黄俊 (1979—),男,浙江金华人,2013年毕业于北京交通大学,地下工程专业,博士,正高级工程师,主要从事隧道与地下工程的设计与研究工作。 E-mail: hj130@jsti.com。*通信作者: 安平, E-mail: 1762834903@qq.com。

Structural Response Analysis of Large-Diameter Underwater Shield Tunnel During Operation Period Under Scouring and Silting Action of Riverbed

HUANG Jun1, AN Ping2, *, DONG Fei1, SHEN Yang3, ZHAO Guang1, CHEN Xikun1   

  1. (1. Urban Construction & Railway Design Division, JSTI GROUP, Nanjing 210019, Jiangsu, China; 2. Hohai University, Nanjing 210098, Jiangsu, China; 3. Nanjing Communications Group, Nanjing 210018, Jiangsu, China)

  • Online:2025-04-20 Published:2025-04-20

摘要: 为揭示河床冲淤作用对水下盾构隧道长期服役性能的影响,基于某长江隧道的运营监测工作,通过实测数据整理以及数值模拟的方式,对历年河床高程变化、水位变化以及隧道结构响应之间的横纵向关系进行研究。主要结论如下: 1)覆土厚度的变化是影响河床冲淤过程中隧道结构响应的关键因素,其极大地影响了隧道横断面的整体沉降趋势。2)管片接缝变形与覆土厚度变化呈正相关,与水位波动呈负相关,且纵缝错台对河床沿隧道纵向的冲淤差异更为敏感。3)基于数值模拟计算,在江中右线某断面,接缝变形随水位变化的回归系数为-0.000 4-0.004 mm/m,随覆土厚度变化的回归系数为0.0030.03 mm/m,表明河床冲淤对隧道接缝的扰动不足以直接影响其防水性能。4)覆土厚度变化能显著改变隧道外围的土压分布,导致接缝变形随河床高程变化的回归系数明显大于随水位变化的回归系数。

关键词: 河床冲淤, 运营期水下大直径盾构隧道, 接缝变形, 监测, 数值模拟

Abstract: To investigate the impact of riverbed scouring and silting on the long-term service performance of underwater shield tunnels, the authors analyze the transverse and longitudinal relationships among historical riverbed elevation changes, water level variations, and tunnel structural responses. The analysis is based on measured data collation and numerical simulations using operational monitoring data from a Yangtze river-crossing tunnel. The main findings are as follows: (1) Overburden thickness is the critical factor influencing structural responses during riverbed scouring and silting, significantly affecting settlement trends of tunnel cross-sections. (2) Segment joint deformations exhibit distinct positive and negative correlations with overburden thickness and water level, respectively. Longitudinal joint dislocations are particularly sensitive to uneven scouring and silting along the tunnel axis. (3) Numerical simulations at a specific cross-section on the rivers right line show that the regression coefficients of joint deformation with water level and overburden thickness range from 0.000 4 to 0.004 mm/m and 0.003 to 0.03 mm/m, respectively, indicating that scouring and silting exert insufficient disturbance on tunnel joints to directly compromise waterproofing performance. (4) Changes in overburden thickness significantly alter the soil pressure distribution around the tunnel, with regression coefficients of joint deformation with riverbed elevation notably exceeding those associated with water level variation.

Key words: riverbed scouring and silting, underwater large-diameter shield tunnel in operational period, joint deformation, monitoring, numerical simulation