重庆轨道交通开敞式TBM施工问题及对策

张志勇1 , 关志鹏2 , 陈小平1 , 刘永升1    

  1. (1.重庆市轨道交通(集团)有限公司, 重庆 400042; 2.重庆市城乡建设委员会, 重庆 400014) 
  • 收稿日期:2013-12-23 修回日期:2014-02-10 出版日期:2014-06-20 发布日期:2014-06-16
  • 作者简介:张志勇(1978—),男,重庆南川人,2009年毕业于重庆交通大学,建筑与土木工程专业,硕士,高级工程师,主要从事岩土工程及城市轨道交通工程项目管理工作。

Problems and Countermeasures in Tunneling by Open TBM in  Chongqing Rail Transit Works

ZHANG Zhiyong1, GUAN Zhipeng2, CHEN Xiaoping1, LIU Yongsheng1   

  1. (1. Chongqing Rail Transit Group Co., Ltd., Chongqing 400042, China; 2. Chongqing Municipal Commission of  UrbanRural Development, Chongqing 400014, China)
  • Received:2013-12-23 Revised:2014-02-10 Online:2014-06-20 Published:2014-06-16

摘要:

重庆轨道交通六号线一期五里店—山羊沟水库敞开段节点工程是开敞式TBM首次应用于城市轨道交通工程。基于TBM试验段工程实践,存在初期支护较强、二次衬砌施工及工期控制难度大等问题,针对这些问题,提出基于“动态设计、动态施工”优化初期支护设计,采用“同步衬砌”方案组织二次衬砌施工,优化开敞式TBM项目工程筹划等措施,保证了开敞式TBM在试验段及后期工程的顺利掘进,并证明了重庆轨道交通地下区间隧道采用开敞式TBM施工的可行性。

关键词: 重庆轨道交通, 开敞式TBM, 初期支护, 二次衬砌, 监控量测

Abstract:

Open TBMs are used in the construction of Wulidian StationShanyanggou Reservoir Station section of the first phase of No. 6 line of Chongqing rail transit project, which is the first time in China that open TBMs have been used in the construction of rail transit works. The engineering practice of the tunneling of the trial section by open TBMs shows that the tunneling has such problems as the primary support being too strong, the secondary lining being difficult to be installed, and the construction schedule being difficult to be controlled. Countermeasures, including optimizing the design of the primary support based on “dynamic design and dynamic construction” concept, adopting “synchronous ling” and optimizing open TBM tunneling plan, are proposed. In the end, the open TBMs have achieved successful driving in the trial section, which verifies the feasibility of open TBMs in the construction of underground tunnels of Chongqing rail transit works. 

Key words: Chongqing rail transit works, open TBM, primary support, secondary lining, monitoring