• 中国科学引文数据库(CSCD)核心期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国权威学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2015, Vol. 35 ›› Issue (9): 962-968.DOI: 10.3973/j.issn.1672-741X.2015.09.017

• 施工机械 • 上一篇    

土压平衡盾构全断面富水砂层带压进舱地层气密性封堵及其检测技术

孙海波   

  1. (中铁隧道集团有限公司专用设备中心, 河南 洛阳 471009)
  • 收稿日期:2015-05-05 修回日期:2015-07-30 出版日期:2015-09-20 发布日期:2015-09-22
  • 作者简介:孙海波(1987—),男,河南洛阳人,2011年毕业于南阳理工学院,机械设计制造及其自动化专业,本科,助理工程师,现主要从事盾构/TBM租赁服务及片区设备管理工作。

How to Achieve Air Tightness around an EPB Shield Boring in Fullface  Waterrich Sand Strata so as to Facilitate Hyperbaric Operation

SUN Haibo   

  1. (Tunnelingdedicated Equipment Center, China Railway Tunnel Group Co., Ltd., Luoyang 471009, Henan, China)
  • Received:2015-05-05 Revised:2015-07-30 Online:2015-09-20 Published:2015-09-22

摘要:

富水砂层与黏性土地层等普通地层相比,其孔隙率大、渗透性强、含水量大,在此类地层中带压进舱作业的难点是地层气密性封堵难度大。在高压环境中,为了尽量减小气体的逃逸,以西安地铁3号线土压平衡盾构在全断面富水砂层中成功带压进舱为依据,通过采用盾体外部膨润土泥浆封堵、掌子面用高效能泥浆形成泥膜封堵、盾尾采用加大同步注浆量和盾尾油脂注入等方法,以及一系列气密性检测等措施,成功进行了带压进舱作业,并得出土压平衡盾构全断面富水砂层气密性封堵的方法及气密性合格的判定方法。

关键词: 西安地铁, 土压平衡盾构, 富水砂层, 带压进舱, 气密性封堵, 泥膜, 气密性检测

Abstract:

Compared to cohesive soil strata, waterrich sand strata have higher porosity, higher permeability and higher water content. When hyperbaric operation is needed during shield boring in waterrich sand strata, it is of great importance to keep the air tightness of the strata around the shield. An EPB shield for Line 3 of Xi’an Metro bores through fullface waterrich sand strata, and hyperbaric operation has to be conducted. The strata around the shield is sealed by bentonite slurry, which is injected through the holes on the shield; the tunnel face is sealed by filter membrane formed by highefficient slurry, the simultaneous grouting and grease injection at the tail shield is enhanced, so as to ensure the air tightness of the sand strata around the shield and in turn to facilitate the hyperbaric operation. Furthermore, a series of air tightness testing and evaluation means are used to verify the sealing effect. In the end, successful air tightness has been achieved and successful hyperbaric operation has been conducted.

Key words: Xi’an Metro, EPB shield, waterrich sand strata, hyperbaric operation, air tightness, filter membrane, air tightness verification

中图分类号: