• 中国科学引文数据库(CSCD)来源期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国核心学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2018, Vol. 38 ›› Issue (12): 1990-1997.DOI: 10.3973/j.issn.2096-4498.2018.12.010

• 规划与设计 • 上一篇    下一篇

长度超过100 m的地铁出入口消防疏散方案研究

杜宇, 姚显贵, 于华   

  1. (中铁第六勘察设计院集团有限公司, 天津 300133)
  • 收稿日期:2018-05-30 修回日期:2018-08-10 出版日期:2018-12-20 发布日期:2019-01-03
  • 作者简介:杜宇(1978—), 男, 辽宁锦州人, 2002年毕业于兰州铁道学院(现兰州交通大学), 建筑工程专业, 本科, 高级工程师, 现从事轨道交通建筑设计及研究工作。Email: 398730339@qq.com。

Study of Fire Protection and Evacuation of Metro Station Entrance/Exit with Length over 100 m

DU Yu, YAO Xiangui, YU Hua   

  1. (China Railway Liuyuan Group Co., Ltd., Tianjin 300133, China)
  • Received:2018-05-30 Revised:2018-08-10 Online:2018-12-20 Published:2019-01-03

摘要:

为了解决长度超过100 m的地铁出入口的消防疏散问题,通过分析《建筑设计防火规范》等消防规范中安全出口的定义,对比《地铁设计规范》等国家标准及北京市《城市轨道交通工程设计规范》等地方标准中关于长度超过100 m出入口消防疏散相关的条文及条文解释,并对目前国内部分城市在实践中采取的具体措施进行综合分析比较。经研究,认为解决超长出入口消防疏散的方案主要有: 1)设置疏散楼梯间; 2)在通道长度不超过100 m处设置分支通道; 3)在通道内设置自动喷水灭火系统; 4)加强通道的防烟排烟措施; 5)将该出入口仅视为过街通道; 6)划分防火分区。对于出入口计算长度,建议统一计算至出入口通道暗埋段。

关键词: 地铁出入口, 消防疏散, 安全出口, 计算长度

Abstract:

In order to meet the fire protection and evacuation requirements of the entrance/exit of metro station with length over 100 m, the definition of safety exit in Code for Fire Protection Design of Buildings is analyzed; comparison of fire protection and evacuation requirements for entrance/exit with length over 100 m is made between national standards such as Code for Design of Metro and regional standards such as Code for Design of Urban Rail Transit (Beijing);and some specific measures adopted in many cities in China are synthetically analyzed. It is concluded that main countermeasures for fire protection and evacuation of entrance/exit of metro station with length over 100 m are as follows: (1) setting up the evacuation staircase; (2) setting up branch passage at the passage with length shorter than 100 m; (3) setting up automatic sprinkler fire extinguishing system in the passage; (4) strengthening the smoke control and exhaust measures of the passage; (5) regarding the entrance/exit as a crossing passage only; (6) dividing the fire protection zones. The calculation length of the entrance/exit is recommended to the mined section.

中图分类号: