- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
隧道建设(中英文) ›› 2019, Vol. 39 ›› Issue (4): 661-668.DOI: 10.3973/j.issn.2096-4498.2019.04.017
NIU Bin, WANG Qi, GUO Ting
牛斌, 王琦, 郭婷
摘要:
The design and flood flowing safety measures of the metro station in the flood district, such as scour protection, flood control, collision prevention and floating resistance, are studied based on the flood control evaluation on the Dongzhuang Station of the Shijiazhuang Metro Line 1 Project (Phase Ⅱ). Then feasible design measures are put forward to meet the requirements of flood control evaluation during different flood return periods. The design scope for main works includes: increasing the burial depth of the station, using the retaining piles as the antifloating piles, and adopting the heightened antiflooding retaining wall and antiflooding baffle. Additionally, the civil airdefense door is also used as the flood gate in case of the unelevated ground at the entrance/exit in auxiliary works. Finally, the base slab at the entrance/exit is lower than the area below the maximum scouring line, the counterweight is backfilled in the void space, and the integral rigidity of the auxiliary structure is enhanced.
中图分类号: