• 中国科学引文数据库(CSCD)来源期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国核心学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2019, Vol. 39 ›› Issue (4): 661-668.DOI: 10.3973/j.issn.2096-4498.2019.04.017

• 规划与设计 • 上一篇    下一篇

Design and Safety Measures of Metro Station in Flood District(行洪区地铁车站设计及安全措施研究)

NIU Bin, WANG Qi, GUO Ting   

  1. (Beijing Urban Construction Design & Development Group Co., Limited, Beijing 100037, China)
  • 收稿日期:2019-01-07 修回日期:2019-03-05 出版日期:2019-04-20 发布日期:2019-05-01
  • 作者简介:牛斌 (1987—),男,安徽阜阳人,2011年毕业于西南交通大学,桥梁与隧道工程专业,硕士,工程师,主要从事隧道与地下工程的设计与研究工作。Email: 420806180@qq.com。

行洪区地铁车站设计及安全措施研究

牛斌, 王琦, 郭婷   

  1. (北京城建设计发展集团股份有限公司, 北京 100037)
  • Received:2019-01-07 Revised:2019-03-05 Online:2019-04-20 Published:2019-05-01

摘要:

The design and flood flowing safety measures of the metro station in the flood district, such as scour protection, flood control, collision prevention and floating resistance, are studied based on the flood control evaluation on the Dongzhuang Station of the Shijiazhuang Metro Line 1 Project (Phase Ⅱ). Then feasible design measures are put forward to meet the requirements of flood control evaluation during different flood return periods. The design scope for main works includes: increasing the burial depth of the station, using the retaining piles as the antifloating piles, and adopting the heightened antiflooding retaining wall and antiflooding baffle. Additionally, the civil airdefense door is also used as the flood gate in case of the unelevated ground at the entrance/exit in auxiliary works. Finally, the base slab at the entrance/exit is lower than the area below the maximum scouring line, the counterweight is backfilled in the void space, and the integral rigidity of the auxiliary structure is enhanced.

关键词: metro station, flood district, flood control evaluation, safety measure, antifloating pile, flood gate

Abstract:

为解决行洪区地铁车站设计中的防冲刷、防淹、防撞、抗浮等问题,结合石家庄地铁1号线2期工程东庄站防洪评价,对行洪区地铁车站设计及行洪安全措施进行研究,提出合理可行的工程设计措施,可满足不同洪水重现期时防洪评价的要求。主体设计措施如下: 1)加大车站埋深、利用围护桩兼抗浮桩; 2)附属设计中出入口地面不抬高,采用加高防淹挡墙和防淹挡板并利用人防门兼做防淹门; 3)出入口底板下沉至最大冲刷线以下,并在空腔内回填配重; 4)加强附属结构整体刚度等。

Key words: 地铁车站, 行洪区, 防洪评价, 安全措施, 抗浮桩, 防淹门