• 中国科学引文数据库(CSCD)来源期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国核心学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2019, Vol. 39 ›› Issue (S1): 38-44.DOI: 10.3973/j.issn.2096-4498.2019.S1.006

• 研究与探索 • 上一篇    下一篇

卵石层小净距隧道关键参数研究

吴梦军1, 2, 3, 曹鹏1, 2, 3   

  1. (1. 招商局重庆交通科研设计院有限公司, 重庆 400067; 2. 公路隧道建设技术国家工程实验室, 重庆 400067; 3. 隧道建设与养护技术交通行业重点实验室, 重庆 400067)
  • 收稿日期:2019-05-05 修回日期:2019-07-23 出版日期:2019-08-30 发布日期:2019-09-12
  • 作者简介:吴梦军(1973—),男,湖南涟源人,2011年毕业于重庆大学,岩土工程专业,博士,成绩优异高级工程师,主要从事隧道工程、地下结构工程等领域的设计研究工作。Email: wumengjun@cmhk.com。
  • 基金资助:

    重庆市集成示范计划项目(cstc2015jcsf30004)

Study on Key Parameters of Small Spacing Tunnels in Pebble Layer

WU Mengjun1, 2, 3, CAO Peng1, 2, 3   

  1. (1. China Merchants Chongqing Communications Technology Research & Design Institute Co., Ltd.,Chongqing 400067, China; 2. National Engineering Laboratory for Highway Tunnel Construction Technology,Chongqing 400067, China; 3. Key Laboratory of Communications of Tunnel Construction & Maintenance Technology, Chongqing 400067, China)
  • Received:2019-05-05 Revised:2019-07-23 Online:2019-08-30 Published:2019-09-12

摘要:

针对卵石地层小净距隧道围岩整体性与稳定性差、施工中易坍塌、围岩相互扰动大的问题,通过FLAC 3D数值模拟和现场监测,对卵石层小净距隧道左右洞合理净距和先后行洞掌子面安全纵向间距进行了研究。得到如下结论: 1)当净距不大于6 m时,隧道地表沉降槽呈“V形”,沉降最大点位于中夹岩顶部;随着净距大于6 m,隧道拱顶部位地表沉降逐渐超过中夹岩顶部,地表沉降槽呈 “W形”。2)当2洞间净距不大于6 m(约1倍洞跨)时,2洞开挖后围岩压力叠加效应明显,极易发生失稳;当隧道净距大于18 m时,可按分离式隧道进行设计; 3)随着先后行洞间掌子面纵向距离的增加,后行洞施工对先行洞的影响逐渐减少,当纵向间距达到30 m(4.6倍洞跨)时,这种影响基本可以不予考虑。

关键词: 卵石层, 小净距隧道, 隧道施工, 净距, 纵向间距

Abstract:

In order to solve the construction problem of small spacing tunnel in pebble layer, i.e. poor integrity and stability of surrounding rock, easy collapse in construction and great disturbance of surrounding rock, through FLAC 3D numerical simulation and field monitoring, the reasonable spacing distance for small spacing tunnel in pebble layer and the safety longitudinal distance between the exist and the following tunnel are analyzed. The results show that: 1) The soil surface settlement curve shows a Vshape pattern and the largest ground settlement is located at the top of middle rock pillar when the spacing between two tunnels is less than 6 meters. When the spacing is larger than 6 meters, the ground settlement corresponding to the tunnel vault is greater than the top area of middle rock pillar, and the soil surface settlement curve shows a Wshape pattern. 2) The pressure of surrounding rock after tunnel excavation exhibits an obvious superimposing effect and the tunnel is easy to collapse when the spacing is less than 6 meters (approximately equal to the tunnel span). The twin tunnel can be designed as two separated tunnels when the spacing distance is larger than 18 meters. 3) The construction of following tunnel has less influence on the existing tunnel with the increase of the longitudinal distance between the two working faces. When the longitudinal distance is greater than 30 meters(4.6time the tunnel span), the effect between the two working faces can be ignored.

Key words: pebble layer, small spacing tunnel, tunnel construction, clear distance, longitudinal distance

中图分类号: