• 中国科学引文数据库(CSCD)来源期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国核心学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2021, Vol. 41 ›› Issue (5): 822-830.DOI: 10.3973/j.issn.2096-4498.2021.05.016

• 规划与设计 • 上一篇    下一篇

地铁矿山法隧道装配式二次衬砌结构设计初步研究

张金伟1, 罗富荣2 , 童丽红3, 杨斌斌1, 徐骞1   

  1. 1. 中铁第六勘察设计院集团有限公司, 天津 300133 2. 北京市轨道交通建设管理有限公司, 北京 100000; 3. 北京市轨道交通设计研究院有限公司, 北京 100000)

  • 出版日期:2021-05-20 发布日期:2021-05-29
  • 作者简介:张金伟(1981—),男,河北承德人,2004年毕业于石家庄铁道学院,土木工程专业,本科,正高级工程师,现主要从事隧道与地下工程方面的设计与研究工作。E-mail: yidianjin@qq.com。

Study on Prefabricated Lining Structure Design of a Metro Tunnel Constructed by Mining Method

ZHANG Jinwei1, LUO Furong2, TONG Lihong3, YANG Binbin1, XU Qian1   

  1. (1. China Railway Liuyuan Group Co., Ltd., Tianjin 300133, China; 2. Beijing Metro Construction Administration Co., Ltd., Beijing 100000, China; 3. Beijing Metro Design and Research Institute Co., Ltd., Beijing 100000, China)

  • Online:2021-05-20 Published:2021-05-29

摘要: 为充分发挥装配式结构的工厂化、模具化、机械化、标准化优势,将装配化引入至矿山法隧道建设中。通过对国内外类似工程详细、深入的调研,借鉴国内外盾构、TBM的成熟设计和施工经验,综合工程类比、理论分析、数值模拟分析、试验研究与现场应用反馈等技术手段,开展地铁矿山法隧道装配式二次衬砌结构初步研究。结果认为矿山法隧道二次衬砌结构采用全部预制构件进行生产及安装可行。矿山法隧道装配式二次衬砌采用马蹄形断面形式,钢筋混凝土平板形衬砌片,衬砌片厚度为300 mm350 mm,分6块,全部预制,错缝拼接,环宽1 200 mm,衬砌片连接采用螺栓连接,根据拼装机设计原理(是否能够提供对衬砌片的持续纵向挤压力)的不同可采用弯螺栓或者直螺栓。

关键词: 地铁, 矿山法, 隧道, 装配式二次衬砌, 预制技术, 衬砌片

Abstract: Prefabricated structures have the advantages of factory, mold, mechanization, and standardization; it can be brought into a metro tunnel constructed by the mining method. Detailed and indepth investigation of similar projects in China and abroad are conducted. As part of the investigation, a preliminary research on the prefabricated secondary lining structure of a metro tunnel constructed by the mining method is carried out using engineering analogy, theoretical analysis, numerical simulation analysis, experimental research, and field application feedback based on the mature design and construction experience of shield and TBM. The results show that it is feasible to use prefabricated components for the secondary lining structure of a tunnel constructed using the mining method. The prefabricated secondary lining adopts a horseshoeshaped crosssection, reinforced concrete flat lining with a thickness of 300 mm or 350 mm and 6 blocks, and a staggered joint with ring width of 1 200 mm. The lining sheets are connected by curved or straight bolts according to the design principle of erectors.