MJS水平旋喷桩在京沈高铁盾构隧道联络通道中的应用

翟志国1, 花楠1, 刘柳2   

  1. 1. 中铁隧道集团二处有限公司, 河北 三河 065201 2. 石家庄铁道大学土木工程学院, 河北 石家庄 050043
  • 出版日期:2021-12-31 发布日期:2022-03-18
  • 作者简介:翟志国(1979—),男,河北邢台人,2004年毕业于石家庄铁道学院,土木工程专业,本科,高级工程师,现从事隧道与地下工程施工技术管理工作。E-mail: 122004248@qq.com。

Application of Metro Jet System Horizontal Jet Grouting Pile in Connection Gallery of BeijingShenyang HighSpeed Railway Shield Tunnel

ZHAI Zhiguo1, HUA Nan1, LIU Liu2   

  1. (1. The 2nd Engineering Co.[KG-*3], Ltd. of China Railway Tunnel Group, Sanhe 065201, Hebei, China; 2. School of Civil Engineering, Shijiazhuang Tiedao University, Shijiazhuang 050043, Hebei, China)

  • Online:2021-12-31 Published:2022-03-18

摘要: 针对北京地区以细砂、粉质黏土、粉细砂等软土为主且带有微承压性的富水软弱地层,京沈高铁盾构隧道5#6#联络通道因地面有建筑物无法采取地面加固措施,为防止联络通道在预加固过程中地层沉降或隆起、因地层加固效果不佳在开挖过程中发生涌水涌砂、掌子面垮塌等风险而引起地面建构筑物坍塌破坏,采用MJS工法向下半圆方式进行喷射的超高压水平旋喷桩加固地层,取得了良好的成桩和止水效果,有效提高土体自稳能力、隔断承压水,最大程度减少联络通道地层加固和开挖施工对地面房屋的沉降影响。在MJS加固期间,地表隆起最大值仅为0.93 mm,开挖和衬砌完成后的最大沉降值仅-2.85 mm,满足房屋鉴定评估控制值的要求,保证了地面建筑物的安全。证明在城市内富水的黏土、粉质黏土、粉细砂层中采用水平MJS工法进行水平旋喷桩加固地层效果显著,可以获得良好的社会效益和经济效益。

关键词: MJS工法, 水平旋喷桩, 高铁, 盾构隧道, 联络通道, 地层加固

Abstract: The ground in Beijing area is mainly composed of waterrich weak soils containing fine sand, silty clay, and silty fine sand. The ground reinforcement cannot be applied to #5 and #6 connection galleries of BeijingShenyang highspeed railway shield tunnel because of buildings on the ground. Hence, to avoid the collapse damage of ground buildings induced by the strata settlement during prereinforcement process, the water and sand gushing due to poor reinforcement effect, and tunnel face collapse, the metro jet system(MJS) method is adopted to consolidate the strata with superhigh pressure horizontal jet grout piles, resulting in good reinforcement effect, which can improve the selfstability and confined water isolating effect of soils and reduce the influence of strata reinforcement and excavation on the settlement of ground buildings to the maximum extent. The results show that the maximum uplift of ground is 0.93 mm, the maximum settlement is -2.85 mm after excavation and lining completion, which meets relevant requirements and guarantees the building safety. The results indicate the prominent ground reinforcement effect of horizontal jet grouting pile by MJS method in waterrich clay, silty clay, and silty fine sand strata in urban areas, which can achieve good social and economical benefits.

Key words: metro jet system method, horizontal jet grouting pile, highspeed railway, shield tunnel, connection gallery, ground reinforcement