隧道建设(中英文) ›› 2023, Vol. 43 ›› Issue (S1): 330-336.DOI: 10.3973/j.issn.2096-4498.2023.S1.038

• 规划与设计 • 上一篇    下一篇

预制拼装式明洞结构在成昆铁路K279崩塌落石治理中的应用

尚寒春, 刘科*, 郦亚军, 刘雄伟   

  1. (中铁二院成都勘察设计研究院有限责任公司, 四川 成都 610031
  • 出版日期:2023-07-31 发布日期:2023-08-28
  • 作者简介:尚寒春(1973—),男,四川大邑人,1996年毕业于西南交通大学,隧道与地下工程专业,本科,高级工程师,从事隧道及地下工程设计工作。 Email: 17854475@qq.com。*通信作者: 刘科, Email: 1244862348@qq.com。

Application of Prefabricated and Assembled Open-Cut Tunnel Structure in Collapse and Rockfall Control of Chengdu-Kunming Railway K279 Section

SHANG Hanchun, LIU Ke*, LI Yajun, LIU Xiongwei   

  1. CREEC (Chengdu) Survey, Design and Research Co., Ltd., Chengdu 610031, Sichuan, China)
  • Online:2023-07-31 Published:2023-08-28

摘要: 针对成昆铁路峨攀段K279发生的崩塌落石灾害,首先,采用Rockfall软件进行落石轨迹及冲击动能分析,评定落石对铁路的危害程度。然后,根据冲击动能计算结果确定坡面帘式防护网的设置范围及被动网和其他防护措施的设置,根据落石影响范围确定明洞接长范围。对于接长明洞,结合现场地形,提出在铁路运营期间增设明洞时采用明洞内外边墙现浇、明洞拱圈预制拼装的方案。最后,介绍明洞内外边墙现浇、明洞拱圈预制拼装方案的设计及施工情况。根据最终的整治效果可知,采用预制拼装式明洞结构方案可安全快速地在既有线增设明洞结构。

关键词: 成昆铁路, 崩塌落石, 预制拼装式明洞结构

Abstract: In view of the collapse and rockfall disaster occurred in the K279 section of the EmeiPanzhihua section of the ChengduKunming railway, the Rockfall software is employed to analyze the rockfall trajectory and impact kinetic energy and assess the damage degree of rockfall to the railway. Furthermore, based on the calculation results of impact kinetic energy, the setting range of the slope curtain protection net and the setting of the passive net and other protective measures are determined, and the extension range of the opencut tunnel is determined based on the impact range of falling rocks. For the extension of the opencut tunnel, an innovative proposal that use the castinplace inner and outer walls of the opencut tunnel and the prefabricated assembly of the opencut tunnel arch ring when adding an opencut tunnel during railway operation is proposed based on the onsite terrain. Finally, the design and construction of the castinplace inner and outer walls of the opencut tunnel and the prefabricated assembly plan of the opencut tunnel arch ring are introduced. According to the final rectification effect, the use of prefabricated and assembled opencut tunnel structures can safely and quickly add opencut tunnel structures to existing lines.

Key words: Chengdu-Kunming railway, collapse and rockfall, prefabricated and assembled open-cut tunnel