隧道建设(中英文) ›› 2016, Vol. 36 ›› Issue (5): 619-626.DOI: 10.3973/j.issn.1672-741X.2016.05.019
• 施工机械 • 上一篇
李海, 朱长松*
收稿日期:
修回日期:
出版日期:
发布日期:
作者简介:
LI Hai, ZHU Changsong*
Received:
Revised:
Online:
Published:
摘要:
为了解决盾构接收井封闭条件下,不能利用接收井正常拆机,只能将盾构解体后从隧道内倒运回始发井的问题,以天津地铁6号线项目6 390 mm开挖直径土压平衡盾构为例,通过设计一套包括刀盘、前体、中体和盾尾在内的盾构主机分割解体方案,有效地解决了盾构主机无法通过隧道内运输的难题。通过这个设计方式,希望对盾构施工过程中存在类似问题的项目提供一些盾构解体分割方案上的参考和借鉴。
关键词: 土压平衡盾构, 盾构解体形式, 车站封闭, 盾构接收
Abstract:
The shield should be transported to launching shaft in tunnel after dismantling when the receiving shaft has been closed. As a result, a series of shield dismantling methods for 6 390 mm EPB shield used in Line No. 6 of Tianjin Metro, including cutterhead dismantling, front shield dismantling, shield body dismantling and shield tail dismantling, are designed and applied; and the shield transport in tunnel can be achieved. The abovementioned shield dismantling methods can provide reference and guidance for similar projects in the future.
Key words: earth pressure balance (EPB) shield, shield dismantling method, closed station, shield receiving
中图分类号:
U 455
李海, 朱长松. 接收车站封闭条件下盾构拆机解体技术探析[J]. 隧道建设, 2016, 36(5): 619-626.
LI Hai, ZHU Changsong. Analysis of Shield Dismantling Method under Conditions of Closed Receiving Shaft[J]. Tunnel Construction, 2016, 36(5): 619-626.