• 中国科学引文数据库(CSCD)来源期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国核心学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2018, Vol. 38 ›› Issue (10): 1698-1705.DOI: 10.3973/j.issn.2096-4498.2018.10.014

• 规划与设计 • 上一篇    下一篇

矿山法海底隧道废水排水系统设计实践

周金忠, 唐健, 贺维国, 范太兴, 张忠品, 杜金海   

  1. (中铁第六勘察设计院集团有限公司, 天津 300308)
  • 收稿日期:2018-04-03 修回日期:2018-07-18 出版日期:2018-10-20 发布日期:2018-10-26
  • 作者简介:周金忠(1964—),男,浙江诸暨人,1987年毕业于西南交通大学,交通运输专业,本科,教授级高级工程师,现从事隧道及地下工程的消防及排水设计工作。Email: 306826754@qq.com。

Design and Application of Wastewater Drainage System in Subsea Tunnel Constructed by Mining Method

ZHOU Jinzhong, TANG Jian, HE Weiguo, FAN Taixing, ZHANG Zhongpin, DU Jinhai   

  1. (China Railway Liuyuan Group Co., Ltd., Tianjin 300308, China)
  • Received:2018-04-03 Revised:2018-07-18 Online:2018-10-20 Published:2018-10-26

摘要:

以青岛胶州湾海底隧道工程为依托,对废水系统排水能力的确定、废水提升方案的选择及废水泵房优化设计等方面进行分析,探讨矿山法海底隧道废水排水系统的主要关键技术。主要结论如下: 1)废水排水能力确定的关键在于隧道的结构渗漏水的定量,常规的水下隧道的结构渗漏水量数据不一定适用于海底隧道,必须实际测量后确定; 2)废水提升方案关系到排水的经济性和安全性,核心在于选取安全可靠的水泵类型; 3)废水泵房优化主要从废水池有效容积、结构设计及设备检修等方面进行展开分析; 4)矿山法海底隧道废水排水系统的设计,必须从隧道实际情况出发,综合考虑各类影响因素,以达到安全、经济的设计目标。

关键词: 海底隧道, 废水排水能力, 废水提升方案, 废水泵选型, 爆管控制技术, 废水池有效容积, 局部动态干式废水泵房

Abstract:

The wastewater drainage system is an important part of the underwater traffic tunnel constructed by mining method. The drainage capacity determination of wastewater drainage system, wastewater lifting scheme and optimization design of wastewater pump room of Qingdao Jiaozhou Bay Subsea Tunnel are analyzed; and the key technologies of wastewater drainage system of subsea tunnel constructed by mining method are discussed. Some conclusions are drawn as follows: (1) The key to the determination of the wastewater drainage capacity lies on quantitation of tunnel structure water leakage; and the conventional quantitation of underwater tunnel structure water leakage cannot be taken as reference for subsea tunnel. (2) The wastewater lifting scheme is closely related to economy and safety; and the core is the wastewater pump type selection. (3) The wastewater pump room can be optimized from the aspects of wastewater tank volume, structure design, equipment maintenance, etc. (4) The drainage system of subsea tunnel constructed by mining method should be determined according to the actual construction conditions to realize safe and economic design.