深汕西改扩建工程超大跨公路隧道设计与实践

梁淦波, 杨宝锋, 祝鑫   

  1. (广东省交通规划设计研究院集团股份有限公司, 广东 广州 510507)
  • 出版日期:2024-08-20 发布日期:2024-09-02
  • 作者简介:梁淦波(1975—),男,广东湛江人,1996年毕业于同济大学,地下工程与隧道工程专业,本科,教授级高级工程师,现从事公路隧道工程的设计、咨询、研究工作。E-mail: 43942558@qq.com。

Design and Practice of Super-Large Span Tunnel for Shenzhen-Shantou Western Expressway Extension Project

LIANG Ganbo, YANG Baofeng, ZHU Xin   

  1. (Guangdong Province Communications Planning & Design Institute Co., Ltd., Guangzhou 510507, Guangdong, China)
  • Online:2024-08-20 Published:2024-09-02

摘要: 为解决超大跨公路隧道在设计施工过程中普遍存在的工法选择、支护参数确定等技术难题,基于广东省深汕西高速改扩建项目双洞8车道超大跨公路隧道建设实例,通过调研、工程类比、模拟计算等方法,进行超大跨公路隧道在施工工法、支护参数、“一洞九线”大型机械化工装配置以及相关优化设计等方面的研究,并通过监控量测对设计方案进行验证。结果表明: 1)现行规范中2、3车道隧道的设计方法仍基本适用于4车道隧道。2)CD法适用于深埋强风化层,且拱顶强风化层厚度不小于1倍洞身开挖宽度;三台阶法适用于深埋中风化层,且拱顶中风化层厚度不小于1倍洞身开挖宽度。3)采用51超前中管棚、掌子面玻璃纤维锚、涨壳式预应力锚杆以及C30早高强喷射混凝土后,在Ⅳ级围岩中进行机械化施工具有较高的可行性。4)在前述超前预加固以及支护优化的前提下,当仰拱与掌子面的距离优化至106 m(CD法)、118 m(三台阶法),二次衬砌与掌子面的距离优化至160 m(CD法)、190 m(三台阶法),机械化施工可达到安全、高效的预期。

关键词: 超大跨公路隧道, 施工工法, 支护参数, 机械化施工

Abstract: To rationally select construction methods and support parameters in the design and construction process of super-large span highway tunnels, a case study is conducted on a double-hole eight-lane super-large span highway tunnel of the Shenzhen-Shantou western expressway extension project in Guangdong province, China. The investigation, engineering analogies, and simulation calculations are employed to examine the construction method, supporting parameters, "one-hole nine-line" large-scale mechanized tooling configuration, and related optimization design of super-large span highway tunnel. Furthermore, the design scheme is validated through monitoring and measuring. The results reveal the following: (1) The design methods for two- and three-lane tunnels in the current specifications are still basically applicable to four-lane tunnels. (2) The centerdiaphragm(CD) method is suitable for deep and strongly-weathered strata with a thickness in the arch no less than 1 times the excavation width of the tunnel; whereas the three-bench method is suitable for deep and moderately-weathered strata with a thickness in the arch no less than 1 times the excavation width of the tunnel. (3) The mechanized construction method can be applied in Grade Ⅳ surrounding rock after implementing advance middle pipe roof, glass fiber anchor, expanded shell prestressed anchor, and C30 early high-strength shotcrete. (4) Under the premise of advance pre-reinforcement and support optimization mentioned above, the mechanized construction method is applicable when the distance between the invert and the tunnel face is optimized to 106 m (CD method) or 118 m (three-bench method), and the distance between the secondary lining and the tunnel face is optimized to 160 m (CD method) or 190 m (threebench method).

Key words: super-large span highway tunnel, construction method, support parameters, mechanized construction