结合厦门翔安海底隧道应用三臂凿岩台车进行钻孔注浆施工的案例,通过多臂凿岩台车与其他钻孔设备的比较,介绍多臂凿岩台车在矿山法暗挖隧道全—强风化地层进行超前预注浆的应用技术及相应适用范围,供类似工程施工参考。
关键词: 多臂凿岩台车, 矿山法, 超前预注浆, 全—强风化地层
Abstract:
Taking the application of the 3boom rock drilling jumbos in the advance pregrouting hole drilling during the construction of Xiang'an subsea tunnel in Xiamen as an example, the author presents the application technologies and application scopes of multiboom rock drilling jumbos in advance pregrouting hole drilling in fullyheavily weathered ground during construction of mined tunnels, by making comparison and contrast between multiboom rock drilling jumbos and other drilling machines. This paper can provide reference for similar projects in the future.
Key words: multiboom rock drilling jumbo, mining method, advance pregrouting, fullyheavily weathered ground
中图分类号:
U 455.3+2
娄掌印. 多臂凿岩台车在矿山法暗挖隧道超前预注浆施工中的应用技术研究[J]. 隧道建设, 2009, 29(5): 582-586.
LOU Zhang-Yin. Application of Multiboom Rock Drilling jumbos in Advance Pre grouting Hole Drilling during Construction of Mined Tunnels[J]. Tunnel Construction, 2009, 29(5): 582-586.