摘要:
以成都地铁一号线盾构4标(火车南站-省体育馆区间隧道)工程为依托,介绍了针对成都地铁富水砂卵石地层,采用土压平衡盾构施工的关键技术。
关键词: 土压平衡盾构, 富水砂卵石地层, 关键技术
Abstract:
Based on the shield tunnel in Bid 4 (tunnel between Chengdu South Railway Station and Gymnasium of Sichuan) on Chengdu Metro Line 1, this thesis discusses about the adoption of a key technology of earth pressure balance shield construction aiming at the water-rich sandy gravel stratum of Chengdu Metro.
Key words: EPB shield, water-rich sandy gravel stratum, key technology
中图分类号:
U 455.43
章龙管, 杨书江, 郭家庆. 富水砂卵石地层土压平衡盾构施工关键技术[J]. 隧道建设, 2009, 29(增刊1): 52-56.
ZHANG Long-Guan, YANG Shu-Jiang, GUO Jia-Qiang. Key Technology of Earth Pressure Balance Shield Construction in Water-rich Sandy Gravel Stratum[J]. Tunnel Construction, 2009, 29(增刊1): 52-56.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.suidaojs.com/CN/B
http://www.suidaojs.com/CN/Y2009/V29/I增刊1/52